flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Guide predicts strongest, weakest AEC markets for 2013

Guide predicts strongest, weakest AEC markets for 2013

2013 Guide to U.S. AEC markets touts apartments, natural gas, senior housing and transmission and distribution.


By Posted by Tim Gregorski, Senior Editor | January 10, 2013

The JAGG Group, a consulting and publishing company dedicated to the architecture, engineering, environmental and construction industries, ranks the apartment market as the hottest for AEC firms working in the United States in 2013.

The company’s 270-page report – The 2013 Guide to the U.S. AEC Markets – ranks 40 separate market sectors served by AEC firms within seven broader categories: residential, commercial, institutional, transportation, water/wastewater, environmental and power.

The full list is available on the firm’s blog (http://www.aecinsight.com).

“Ranking the markets according to a variety of factors, including size, anticipated growth and intangibles unique to the individual market gives some guidance to firms planning their marketing and business development approach in 2013,” says report author Jerry Guerra. “The intention is to show the relative strength various markets served by AEC firms in the United States. It is essentially a summary of the data and information presented throughout the rest of the report, which is where the real meat of these rankings lies.”

The report predicts that the multifamily-for-rent market, which enjoyed solid growth and high activity in 2012, will repeat its strong performance in 2013. The apartment market is followed in the rankings by natural gas, senior housing, transmission/ distribution and health care as the five markets anticipated to be the healthiest in 2013.

On the opposite end of the ranking for the New Year are high-speed rail, nuclear power and brownfields.

The report ranks the markets according to a weighted scale that takes into account the market’s size, short-term growth projection (2013), long-term growth projection (annualized five-year estimate) and a variety of intangible factors.

The intangible category – worth 20% of the total – is included to adjust for factors outside of size and anticipated growth. For example, single-family housing is a massive market expected to have a high growth rate in both the short- and long-term. However, because the market is recovering from such a low point, competition is high (including many small firms still starving for work) and opportunities for traditional architecture and engineering firms are limited, the “intangible” category drags the single-family housing market closer to the middle of the pack (12th overall).

To support the market sector rankings and provide more insight into their outlook for 2013, the book includes more than 150 pages of analysis. The annual report – the sixth authored by the 10-year-old JAGG Group – also includes top industry trends, an analysis of the 2012 Election results, an overview of the industry and U.S. economy, and a glimpse of international market opportunities for 2013. +

 

 

Related Stories

| Aug 29, 2012

Mamayek joins HDR as Design Principal in Boston

He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.

| Aug 28, 2012

McCarthy begins construction on transportation center at Bob Hope Airport

Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.

| Aug 28, 2012

Wisnewski Blair & Associates changes name to HGA Mid-Atlantic

New name reflects firm's growing design resources on East Coast.

| Aug 24, 2012

Meis heads to Woods Bagot Sport

Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.

| Aug 21, 2012

Under 40 Leadership Summit slated for October 3-5 in Chicago

Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

boombox1
boombox2
native1

More In Category




Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021