flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Guide predicts strongest, weakest AEC markets for 2013

Guide predicts strongest, weakest AEC markets for 2013

2013 Guide to U.S. AEC markets touts apartments, natural gas, senior housing and transmission and distribution.


By Posted by Tim Gregorski, Senior Editor | January 10, 2013

The JAGG Group, a consulting and publishing company dedicated to the architecture, engineering, environmental and construction industries, ranks the apartment market as the hottest for AEC firms working in the United States in 2013.

The company’s 270-page report – The 2013 Guide to the U.S. AEC Markets – ranks 40 separate market sectors served by AEC firms within seven broader categories: residential, commercial, institutional, transportation, water/wastewater, environmental and power.

The full list is available on the firm’s blog (http://www.aecinsight.com).

“Ranking the markets according to a variety of factors, including size, anticipated growth and intangibles unique to the individual market gives some guidance to firms planning their marketing and business development approach in 2013,” says report author Jerry Guerra. “The intention is to show the relative strength various markets served by AEC firms in the United States. It is essentially a summary of the data and information presented throughout the rest of the report, which is where the real meat of these rankings lies.”

The report predicts that the multifamily-for-rent market, which enjoyed solid growth and high activity in 2012, will repeat its strong performance in 2013. The apartment market is followed in the rankings by natural gas, senior housing, transmission/ distribution and health care as the five markets anticipated to be the healthiest in 2013.

On the opposite end of the ranking for the New Year are high-speed rail, nuclear power and brownfields.

The report ranks the markets according to a weighted scale that takes into account the market’s size, short-term growth projection (2013), long-term growth projection (annualized five-year estimate) and a variety of intangible factors.

The intangible category – worth 20% of the total – is included to adjust for factors outside of size and anticipated growth. For example, single-family housing is a massive market expected to have a high growth rate in both the short- and long-term. However, because the market is recovering from such a low point, competition is high (including many small firms still starving for work) and opportunities for traditional architecture and engineering firms are limited, the “intangible” category drags the single-family housing market closer to the middle of the pack (12th overall).

To support the market sector rankings and provide more insight into their outlook for 2013, the book includes more than 150 pages of analysis. The annual report – the sixth authored by the 10-year-old JAGG Group – also includes top industry trends, an analysis of the 2012 Election results, an overview of the industry and U.S. economy, and a glimpse of international market opportunities for 2013. +

 

 

Related Stories

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

| Jun 7, 2013

Must see: Building façade made of massive concrete drain pipes

Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.

| Jun 7, 2013

40 Under 40 retrospective: Where are they now?

Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.

| Jun 7, 2013

First look: University of Utah's ‘teaching hospital for law’

The University of Utah broke ground on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.

| Jun 7, 2013

First look: Austin breaks ground on 'light-filled' Central Library

The design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.

| Jun 5, 2013

Survey of AE firms shows profits, hiring on the rise

A recent survey of more than 40 Boston-area architecture and engineering companies by consulting firm DiCicco, Gulman & Company confirms continued growth in business volume.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021