flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Guide on electrifying space heating for large commercial buildings with boilers released

Codes and Standards

Guide on electrifying space heating for large commercial buildings with boilers released

The guide summarizes key considerations for people seeking to retrofit existing large commercial and multifamily buildings, particularly those that currently heat spaces using fossil fuel-fired boilers.


By Peter Fabris, Contributing Editor | May 10, 2024
Guide on electrifying space heating for large commercial buildings with boilers released
Photo: DOE

The U.S. Department of Energy has released a guide on electrifying space heating for large commercial buildings with boilers.

The guide summarizes key considerations for people seeking to retrofit existing large commercial and multifamily buildings, particularly those that currently heat spaces using fossil fuel-fired boilers. It provides an overview for building owners, contractors, and other stakeholders involved with heating, ventilation, and air-conditioning (HVAC) about possible design and purchasing decisions.

It includes discussion of motivations for electrification, electric space heating technologies, boiler retrofit evaluations and processes, and other project considerations. The document provides case studies that demonstrate best practices and lessons learned.

Although the topic of commercial building electrification has seen increased interest in recent years, most projects and case studies focus on new construction rather than retrofitting existing systems, which make up the vast majority of commercial buildings, DOE says.

Related Stories

| Jun 5, 2012

HP Labs aims for net-zero energy data centers

Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.

| Jun 5, 2012

USGBC delays LEED 2012; renames it LEED v4

In response to concerns by LEED users, the U.S. Green Building Council (USGBC) announced that it will delay the ballot on LEED 2012 until June 1, 2013.

| Jun 5, 2012

Baltimore officials vow to block $1.8 billion urban renewal project

Baltimore officials want to block a $1.8 billion urban renewal project until more neighborhood residents and minority contractors are hired and displaced residents can benefit from the revitalization.

| Jun 5, 2012

OSHA launches campaign to warn of heat dangers in outdoor work

The Occupational Safety and Health Administration has begun a campaign to warn outdoor workers about the dangers of heat exposure.

| Jun 5, 2012

AGC’s Safety and Health Conference focuses on regulations, legislation

More than 150 industry professionals and other attendees will participate in the Associated General Contractors of America’s (AGC’s) safety and health conference July 11-13 in Washington, D.C.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

Proposed change in Michigan’s building code would hurt innovation, say critics

Legislation pending before the Michigan Senate would change the law that calls for building codes to be updated every three years to require an update only every six years.

| May 31, 2012

Natural gas industry opposes federal carbon-neutral construction rule

The natural gas industry and some allies are working to block a federal green building rule that was expected to be a national model for carbon-neutral construction.

| May 31, 2012

Lawsuits push the legal boundaries of green building definition

This article explores some legal issues stemming from lawsuits in which plaintiffs have charged developers with not delivering on a promised level of sustainability.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021