flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA releases updated standards to move federal buildings toward zero emissions

Government Buildings

GSA releases updated standards to move federal buildings toward zero emissions

Mandatory design and construction standards, performance criteria for 300,000 federal buildings


By Peter Fabris, Contributing Editor | August 14, 2024
Image by rus-burkhanov from Pixabay

Image by rus-burkhanov from Pixabay

The U.S. General Services Administration (GSA) recently released updated building efficiency standards for federal buildings.

The mandatory design and construction standards and performance criteria apply to 300,000 federal buildings. The standards will advance building efficiency, reduce emissions, and increase resilience, according to a GSA news release.

The standards will advance the Federal Sustainability Plan to achieve net-zero emissions from all federal buildings by 2045, and promote the use of American-made, low carbon construction materials.

The P100 standards require that facilities adopt advanced energy conservation strategies and eliminate on-site fossil fuel use. The standards call for grid-interactive efficient buildings, leverage innovative technologies through GSA’s Green Proving Ground, require the use of low-embodied carbon materials, and potable water reuse.

The standards address:

• Electrification: New standards for building equipment and systems to be powered by clean energy sources.
• Embodied Carbon: Requirement to utilize low-embodied carbon materials, including salvaged, reused, regenerative, and biomimetic options. 
• Energy Efficiency: Enhanced building envelope performance to minimize energy loss and improve overall efficiency.
• Grid-Interactive Efficient Buildings: New measures to support a more resilient, responsive grid.

Related Stories

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

| Feb 26, 2012

Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.

Space leased by U.S. General Service Administration.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

| Feb 14, 2012

SAIC selected for architectural and engineering design services at Lajes Field, Azores

SAIC’s services will include a broad variety of new construction projects and maintenance and repair projects

| Jan 4, 2012

New LEED Silver complex provides space for education and research

The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021