flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA releases updated standards to move federal buildings toward zero emissions

Government Buildings

GSA releases updated standards to move federal buildings toward zero emissions

Mandatory design and construction standards, performance criteria for 300,000 federal buildings


By Peter Fabris, Contributing Editor | August 14, 2024
Image by rus-burkhanov from Pixabay

Image by rus-burkhanov from Pixabay

The U.S. General Services Administration (GSA) recently released updated building efficiency standards for federal buildings.

The mandatory design and construction standards and performance criteria apply to 300,000 federal buildings. The standards will advance building efficiency, reduce emissions, and increase resilience, according to a GSA news release.

The standards will advance the Federal Sustainability Plan to achieve net-zero emissions from all federal buildings by 2045, and promote the use of American-made, low carbon construction materials.

The P100 standards require that facilities adopt advanced energy conservation strategies and eliminate on-site fossil fuel use. The standards call for grid-interactive efficient buildings, leverage innovative technologies through GSA’s Green Proving Ground, require the use of low-embodied carbon materials, and potable water reuse.

The standards address:

• Electrification: New standards for building equipment and systems to be powered by clean energy sources.
• Embodied Carbon: Requirement to utilize low-embodied carbon materials, including salvaged, reused, regenerative, and biomimetic options. 
• Energy Efficiency: Enhanced building envelope performance to minimize energy loss and improve overall efficiency.
• Grid-Interactive Efficient Buildings: New measures to support a more resilient, responsive grid.

Related Stories

Government Buildings | Feb 26, 2021

Design unveiled for federal courthouse in Huntsville, Ala.

Fentress Architects is designing the facility in collaboration with Studio Scarab Architecture Interiors Planning and Payne Design Group Architects.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Government Buildings | Feb 9, 2021

The New Johnson County Courthouse opens in Olathe, Kan.

Fentress Architects, in collaboration with TreanorHL, designed the project.

Government Buildings | Feb 1, 2021

U.S. Embassy in New Delhi breaks ground on expansion

Weiss/Manfredi is designing the project.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Government Sector Giants: Top architecture, engineering, and construction firms in the U.S. government buildings sector

HNTB, Jacobs, and Turner top BD+C's rankings of the nation's largest government sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Government Buildings | Nov 25, 2020

New Indiana Toll Road headquarters creates unified environment for staff

New LEED Gold facility consolidates operations for tollway authority.

Government Buildings | Nov 13, 2020

Tax shortfalls nip government projects in the bud

Federal contracts are proceeding, but states and cities are delaying, deferring, and looking for private investment.

boombox1
boombox2
native1

More In Category


Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021