The U.S. General Services Administration (GSA) has named Charles (Chuck) Hardy as GSA’s next Chief Architect, effective August 14, 2022.
A licensed architect, workplace strategist, and certified construction manager, Hardy’s career with GSA spans more than 31 years, beginning in GSA’s Great Lakes Region as an architect and project manager. He has since spent time in a variety of leadership positions in the Great Lakes Region and GSA’s Central Office in Washington, DC, including as Director of Design and Construction, and most recently, as GSA’s Acting Chief Architect.
As Chief Architect, Hardy will serve as a Senior Advisor to GSA Administrator Robin Carnahan, as well as to Public Buildings Service (PBS) Commissioner Nina Albert, on all matters related to federal architecture and design for GSA’s capital construction program. Additionally, his role will include administering GSA’s Design Excellence, historic preservation, and art-in-architecture programs.
“GSA’s Chief Architect is one of the most influential architectural roles in Government, and we are thrilled to have Chuck serve in this position,” said PBS Commissioner Nina Albert. “He brings the leadership and vision necessary to deliver on GSA’s mission of providing high-quality buildings and effective, sustainable workplaces to Federal agencies at the best value for the American taxpayer.”
Prior to joining GSA, Hardy was a practicing architect with firms in Florida, Colorado, and Illinois. He earned his professional degrees in architecture and environmental design from the University of Minnesota and holds certificates from the Harvard Graduate School of Design and The University of Texas McCombs School of Business. Hardy is also a retired officer of the U.S. Air Force, where he served as an intelligence officer.
Related Stories
| Nov 22, 2011
Suffolk Construction selected as contractor for Boston luxury residential tower
Project team breaks ground on 488,000-sf building that will feature world-class amenities.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Nov 21, 2011
Mortenson and enXco partnership to build its 19th wind project
The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
| Nov 21, 2011
FDH Engineering acquires Energy Solutions
All ESI employees have been merged into FDH’s staff at its St. Louis office.
| Nov 18, 2011
Centre for Interactive Research on Sustainability opens
Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.
| Nov 17, 2011
SmithGroup changes name to SmithGroupJJR
SmithGroup and JJR join brands to become a single, multi-disciplinary company.
| Nov 17, 2011
Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings
Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.