Perkins School for the Blind propels its Watertown, MA, campus into the future with the dedication of the Grousbeck Center for Students & Technology on Monday, Nov. 7.
Inspired by a parent’s observation that her teen-aged son was missing out on the kinds of natural social interactions that help youngsters become young adults, the new building contains space for playing high-tech games, making music, learning about new technology, practicing vocational skills and just plain hanging out.
Built by Shawmut Design and Construction from architectural plans created by the Gund Partnership, each aspect of the 17,000 sf. Grousbeck Center is designed to enable innovation, interaction, and independence. Singular features like the world’s first interactive tactile audio campus map and a 3D topographical map that was sculpted by a robotic arm add to the futuristic feel.
The Grousbeck Center is unique because it is not only a Student Center, but also a world-class teacher training facility. Controlled by iPads, which are readily accessible to people with visual impairments, meeting and training rooms at the Grousbeck Center are wired for international access to connect educators in all corners of the globe through video conferencing.
The Grousbeck Center was built with a lead gift of $10 million from the Grousbeck Family Foundation. That leadership gift has been a key element in Perkins ongoing Touch Our World Comprehensive Campaign to raise $130 million. The funds will advance capital projects such as the Grousbeck Center, technology upgrades, educational programs, the Braille and Talking Book Library and international partnerships. As of this summer, the campaign has raised $104 million, with 20 months to go. BD+C
Related Stories
| Jun 4, 2012
Brownfield goes green
Chicago Center for Green Technology uses high-speed, energy-efficient hand dryers to share its green message and earn LEED credits.
| Jun 4, 2012
KBE Building and CTA Construction awarded Project of the Year from CMAA
Award given for work done on the renovation of Beverly High School in Beverly, Mass.
| Jun 4, 2012
Pressley promoted to Senior VP and CIO at Hill International
Pressley will be responsible for managing all of Hill's information technology systems and software worldwide.
| Jun 4, 2012
Stalco Construction promotes Scott Pavick to chief estimator
Pavick manages the estimating department and is responsible for developing cost estimates and budgets, value engineering, and subcontractor bid evaluation and negotiations.
| Jun 4, 2012
HBD Construction to build new training campus in St. Louis
Larger campus facility will expand training opportunities for plumbers and pipefitters.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| Jun 1, 2012
Caruso to lead Gensler’s Asia talent development
Caruso will be based in Shanghai and working with the Gensler offices in Japan, China, South Korea, Singapore, Thailand, and India until the spring of 2013.
| Jun 1, 2012
AIA 2030 Commitment Program reports new results
The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.
| Jun 1, 2012
Robert Wilson joins SmithGroupJJR
Wilson makes the move to SmithGroupJJR from VOA Associates, Inc., where he served as a senior vice president and technical director in its Chicago office.
| Jun 1, 2012
Gilbane Building's Sue Klawans promoted
Industry veteran tasked with boosting project efficiency and driving customer satisfaction, to direct operational excellence efforts.