Perkins School for the Blind propels its Watertown, MA, campus into the future with the dedication of the Grousbeck Center for Students & Technology on Monday, Nov. 7.
Inspired by a parent’s observation that her teen-aged son was missing out on the kinds of natural social interactions that help youngsters become young adults, the new building contains space for playing high-tech games, making music, learning about new technology, practicing vocational skills and just plain hanging out.
Built by Shawmut Design and Construction from architectural plans created by the Gund Partnership, each aspect of the 17,000 sf. Grousbeck Center is designed to enable innovation, interaction, and independence. Singular features like the world’s first interactive tactile audio campus map and a 3D topographical map that was sculpted by a robotic arm add to the futuristic feel.
The Grousbeck Center is unique because it is not only a Student Center, but also a world-class teacher training facility. Controlled by iPads, which are readily accessible to people with visual impairments, meeting and training rooms at the Grousbeck Center are wired for international access to connect educators in all corners of the globe through video conferencing.
The Grousbeck Center was built with a lead gift of $10 million from the Grousbeck Family Foundation. That leadership gift has been a key element in Perkins ongoing Touch Our World Comprehensive Campaign to raise $130 million. The funds will advance capital projects such as the Grousbeck Center, technology upgrades, educational programs, the Braille and Talking Book Library and international partnerships. As of this summer, the campaign has raised $104 million, with 20 months to go. BD+C
Related Stories
Contractors | Sep 30, 2015
FMI: Construction in place on track for sustained growth through 2016
FMI’s latest report singles out manufacturing, lodging, and office sectors as the drivers of nonresidential building activity and investment.
Reconstruction & Renovation | Sep 29, 2015
What went wrong? Diagnosing building envelope distress [AIA course]
With so many diverse components contributing to building envelope assemblies, it can be challenging to determine which of these myriad elements was the likely cause of a failure.
Architects | Sep 24, 2015
Supertall buildings vie for dominance along Chicago’s skyline
The latest proposals pit designs by Rafael Viñoly, Jeanne Gang, and Helmut Jahn.
Architects | Sep 24, 2015
From Gehry to the High Line: What makes a project a game-changer?
Each year, there are a handful of projects that significantly advance the AEC industry or a particular building type. Send us your game-changing projects for BD+C’s January 2016 special report.
Cultural Facilities | Sep 24, 2015
Bakpak Architects' 'pottery courtyard' concept in Poland incorporates local heritage
The multifunctional building proposed for Rzeszow, Poland, looks like it was handcrafted on a potter’s wheel.
Modular Building | Sep 23, 2015
SOM and DOE unveil 3D-printed, off-the-grid building
The Additive Manufacturing Integrated Energy (AMIE) building features a high-performance shell with a photovoltaic roof and built-in natural gas generator.
Airports | Sep 23, 2015
JFK Airport's dormant TWA terminal will be reborn as a hotel
After 15 years of disuse, the Googie architecture-inspired TWA Flight Center at New York’s John F. Kennedy International Airport will be transformed into a hotel. Gizmodo reports that the city’s Port Authority chose a renovation proposal from Jet Blue this week.
Architects | Sep 23, 2015
Architecture billings dip in August, but no 'cause for concern' says AIA economist
The American Institute of Architects reported the August ABI score was 49.1, down from a mark of 54.7 in July. This score reflects a slight decrease in design services.
Sports and Recreational Facilities | Sep 21, 2015
Tokyo Olympic Stadium saga ends for Zaha Hadid
After resubmitting a bid, the firm will not design the main venue for the 2020 Olympics after all.
University Buildings | Sep 21, 2015
6 lessons in campus planning
For campus planning, focus typically falls on repairing the bricks and mortar without consideration of program priorities. Gensler's Pamela Delphenich offers helpful tips and advice.