A groundbreaking ceremony was recently held for Valencia College West Campus Building 10, a new $13.3 million, 59, 511-sf facility now under way in Orlando by the design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.
The three-story facility will house Valencia’s Continuing and International Education, as well as the Office of Information Technology. One unique feature will be the high-tech “Collaboratory” which includes approximately 12,000-sf of dedicated space specifically designed to enhance and promote creative discourse for groups ranging in size from 3 to 80 participants.
The collaboratory concept is intended to support multiple sizes and types of meetings simultaneously. The intent of this collection of spaces is to provide a place for idea generation, strategic planning, and execution of ideas among students, faculty and even visiting members of the business community. Slated for completion in January 2013, Building 10 will also offer classrooms, a testing center, administrative offices and additional meeting rooms. The facility is slated to achieve a Level 2 Green Globes Certification.
SchenkelShultz also designed Valencia College at Lake Nona’s new $21,750,000 Classroom Building now under construction, and provided the initial master plan study for the new 23-acre Lake Nona campus located southeast of Orlando International Airport. Scheduled for completion in July 2012, the three-story, 82,280-sf facility will be the first of four planned buildings at Valencia’s Lake Nona campus. BD+C
Related Stories
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 26, 2012
Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.
Space leased by U.S. General Service Administration.
| Feb 26, 2012
Alvarez-Glasman & Colvin’s Chen LEED certified
Chen works closely with property owners to ensure that their properties meet and exceed all industry standards, and also provide long-term energy savings.
| Feb 24, 2012
ABI remains positive for three straight months
The AIA reported the January ABI score was 50.9, following a mark of 51.0 in December.
| Feb 24, 2012
Larry Lord joins HDR Architecture as south region science and technology director
A founding partner at Lord, Aeck & Sargent, Lord is nationally renowned for his leadership in architecture for complex projects.
| Feb 24, 2012
Pottorff elevated to principal at Ricci Greene Associates
Pottorff is recognized in the justice field as an expert solely dedicated to the design and planning of courts and urban jails in both the U.S. and Canada.
| Feb 24, 2012
Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence
Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects
| Feb 23, 2012
Federal budget cuts put major building projects on hold
A plan to build the National Bio and Agro-Defense Facility in Kansas is among several major building projects in jeopardy after the Obama administration’s 2013 budget was unveiled. The budget would cut all construction spending for the facility.