A groundbreaking ceremony was recently held for Valencia College West Campus Building 10, a new $13.3 million, 59, 511-sf facility now under way in Orlando by the design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.
The three-story facility will house Valencia’s Continuing and International Education, as well as the Office of Information Technology. One unique feature will be the high-tech “Collaboratory” which includes approximately 12,000-sf of dedicated space specifically designed to enhance and promote creative discourse for groups ranging in size from 3 to 80 participants.
The collaboratory concept is intended to support multiple sizes and types of meetings simultaneously. The intent of this collection of spaces is to provide a place for idea generation, strategic planning, and execution of ideas among students, faculty and even visiting members of the business community. Slated for completion in January 2013, Building 10 will also offer classrooms, a testing center, administrative offices and additional meeting rooms. The facility is slated to achieve a Level 2 Green Globes Certification.
SchenkelShultz also designed Valencia College at Lake Nona’s new $21,750,000 Classroom Building now under construction, and provided the initial master plan study for the new 23-acre Lake Nona campus located southeast of Orlando International Airport. Scheduled for completion in July 2012, the three-story, 82,280-sf facility will be the first of four planned buildings at Valencia’s Lake Nona campus. BD+C
Related Stories
| Apr 27, 2012
CSM Group names Comerford as senior project manager
Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.
| Apr 27, 2012
Hampton Bays Middle School winner of the first National Green Ribbon Schools Program
School was the first LEED-certified public school in the state of New York.
| Apr 26, 2012
USGBC announces inaugural Green Apple Day of Service
On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and campuses in their communities healthier and more sustainable.
| Apr 26, 2012
Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort
Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.
| Apr 26, 2012
Blackney Hayes Architects launches new engineering division
The new division, BHH Engineers, will be led by Mark Hershman, PE.
| Apr 26, 2012
Energy efficiency requirements heighten the importance of proper protection for roofing systems
Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.
| Apr 26, 2012
Orange County, Fla. high school receives NAIOP “Public Development of the Year” award
School replacement designed by SchenkelShultz Architecture and constructed by Williams Co.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Apr 25, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center
Project receives LEED Gold Certification.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.