A groundbreaking ceremony was recently held for Valencia College West Campus Building 10, a new $13.3 million, 59, 511-sf facility now under way in Orlando by the design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.
The three-story facility will house Valencia’s Continuing and International Education, as well as the Office of Information Technology. One unique feature will be the high-tech “Collaboratory” which includes approximately 12,000-sf of dedicated space specifically designed to enhance and promote creative discourse for groups ranging in size from 3 to 80 participants.
The collaboratory concept is intended to support multiple sizes and types of meetings simultaneously. The intent of this collection of spaces is to provide a place for idea generation, strategic planning, and execution of ideas among students, faculty and even visiting members of the business community. Slated for completion in January 2013, Building 10 will also offer classrooms, a testing center, administrative offices and additional meeting rooms. The facility is slated to achieve a Level 2 Green Globes Certification.
SchenkelShultz also designed Valencia College at Lake Nona’s new $21,750,000 Classroom Building now under construction, and provided the initial master plan study for the new 23-acre Lake Nona campus located southeast of Orlando International Airport. Scheduled for completion in July 2012, the three-story, 82,280-sf facility will be the first of four planned buildings at Valencia’s Lake Nona campus. BD+C
Related Stories
Mixed-Use | Feb 11, 2015
Developer plans to turn Eero Saarinen's Bell Labs HQ into New Urbanist town center
Designed by Eero Saarinen in the late 1950s, the two-million-sf, steel-and-glass building was one of the best-funded and successful corporate research laboratories in the world.
Architects | Feb 11, 2015
Shortlist for 2015 Mies van der Rohe Award announced
Copenhagen, Berlin, and Rotterdam are the cities where most of the shortlisted works have been built.
BIM and Information Technology | Feb 10, 2015
Google's 3D scanning camera leaves the lab
Google is said to be partnering with LG to create a version of the technology for public release sometime this year.
Steel Buildings | Feb 10, 2015
Korean researchers discover 'super steel'
The new alloy makes steel as strong as titanium.
Architects | Feb 9, 2015
The generalist architect vs. the specialist architect
The corporate world today quite often insists on hiring specialists, but the generalists have an intrinsic quality to adapt to new horizons or even cultural shifts in the market, writes SRG Partnership's Gary Harris.
Museums | Feb 9, 2015
Herzog & de Meuron's M+ museum begins construction in Hong Kong
When completed, M+ will be one of the first buildings in the Foster + Partners-planned West Kowloon Cultural District.
Multifamily Housing | Feb 9, 2015
GSEs and their lenders were active on the multifamily front in 2014
Fannie Mae and Freddie Mac securitized more than $57 billion for 850,000-plus units.
BIM and Information Technology | Feb 8, 2015
BIM for safety: How to use BIM/VDC tools to prevent injuries on the job site
Gilbane, Southland Industries, Tocci, and Turner are among the firms to incorporate advanced 4D BIM safety assessment and planning on projects.
Museums | Feb 6, 2015
Tacoma Art Museum's new wing features sun screens that operate like railroad box car doors
The 16-foot-tall screens, operated by a hand wheel, roll like box car doors across the façade and interlace with a set of fixed screens.
Office Buildings | Feb 6, 2015
6 factors steering workplace design at financial services firms
Grossly underutilized space and a lack of a mobility strategy are among the trends identified by HOK based on its research of 11 top-tier financial services firms.