Expansion plans at Scripps Memorial Hospital Encinitas took a step forward with the groundbreaking of a Critical Care Building, which will more than double the size of the hospital’s current emergency department and increase the number of medical-surgical beds by 43%.
The Critical Care Building is the centerpiece of the hospital’s $94 million second phase of expansion, which also includes a new central energy plant and various infrastructure improvements on and around the medical campus.
The population of the hospital’s surrounding area has increased by more than 20% during the past decade, according to the San Diego Association of Governments. During the same time period, the overall number of annual patient visits to the hospital has also increased by more than 20%. The Critical Care Building will be the first patient care facility to be built at Scripps Encinitas since 1992.
The Critical Care Building and central energy plant are being built on the site of a former parking lot on the southwest part of the hospital campus. Totaling 61,643-sf, the two-story Critical Care Building is expected to be open for patient care by early summer 2014. BD+C
Related Stories
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Feb 1, 2012
‘Augmented reality’ comes to the job site
A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.
| Feb 1, 2012
Blackney Hayes designs school for students with learning differences
The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future.
| Feb 1, 2012
Two new research buildings dedicated at the University of South Carolina
The two buildings add 208,000 square feet of collaborative research space to the campus.
| Feb 1, 2012
List of Top 10 States for LEED Green Buildings released?
USGBC releases list of top U.S. states for LEED-certified projects in 2011.