flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ground broken for $94 million hospital expansion at Scripps Encinitas

Ground broken for $94 million hospital expansion at Scripps Encinitas

New facility to more than double emergency department size, boost inpatient beds by 43%.


By Posted by Tim Gregorski, Senior Editor | May 3, 2012
The Critical Care Building is the centerpiece of the hospitals $94 million seco
The Critical Care Building is the centerpiece of the hospitals $94 million second phase of expansion, which also includes a new

Expansion plans at Scripps Memorial Hospital Encinitas took a step forward with the groundbreaking of a Critical Care Building, which will more than double the size of the hospital’s current emergency department and increase the number of medical-surgical beds by 43%.

The Critical Care Building is the centerpiece of the hospital’s $94 million second phase of expansion, which also includes a new central energy plant and various infrastructure improvements on and around the medical campus.

The population of the hospital’s surrounding area has increased by more than 20% during the past decade, according to the San Diego Association of Governments. During the same time period, the overall number of annual patient visits to the hospital has also increased by more than 20%. The Critical Care Building will be the first patient care facility to be built at Scripps Encinitas since 1992.

The Critical Care Building and central energy plant are being built on the site of a former parking lot on the southwest part of the hospital campus. Totaling 61,643-sf, the two-story Critical Care Building is expected to be open for patient care by early summer 2014. BD+C

Related Stories

| Jun 11, 2012

Historic church gains energy efficiency, retains aesthetics with architecturally rated windows

New windows would need to not only stand the test of time, but also accommodate the aesthetics of an architecturally historic church.

| Jun 11, 2012

Genivar and WSP Group join forces

Genivar concurrently announces a $225 million public bought deal of subscription receipts, a $197 million private placement of subscription receipts and new credit facilities.

| Jun 11, 2012

SimplexGrinnell highlights integrated suite of web-based technologies at NFPA Expo

eservices platform uses the power of the Internet to deliver more value to customers.

| Jun 11, 2012

Reed Construction announces new hire and promotion

Reed Construction hired Augie Insalaco as a project manager and promoted Matt Mahoney from project intern to project engineer.

| Jun 11, 2012

Hill International selected as CM for Porto Arabia Towers in Qatar

The complex is a mixed-use development featuring both residential and commercial properties.

| Jun 8, 2012

Living Building Challenge wins the 2012 Buckminster Fuller Challenge

The Living Building Challenge was chosen from a pool of 122 of entries from around the world.

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 8, 2012

Skyline Construction names Millitello president

Millitello is a 31-year veteran who has overseen the construction of campus-size projects.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021