Expansion plans at Scripps Memorial Hospital Encinitas took a step forward with the groundbreaking of a Critical Care Building, which will more than double the size of the hospital’s current emergency department and increase the number of medical-surgical beds by 43%.
The Critical Care Building is the centerpiece of the hospital’s $94 million second phase of expansion, which also includes a new central energy plant and various infrastructure improvements on and around the medical campus.
The population of the hospital’s surrounding area has increased by more than 20% during the past decade, according to the San Diego Association of Governments. During the same time period, the overall number of annual patient visits to the hospital has also increased by more than 20%. The Critical Care Building will be the first patient care facility to be built at Scripps Encinitas since 1992.
The Critical Care Building and central energy plant are being built on the site of a former parking lot on the southwest part of the hospital campus. Totaling 61,643-sf, the two-story Critical Care Building is expected to be open for patient care by early summer 2014. BD+C
Related Stories
| Dec 6, 2012
Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities
Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.
| Dec 5, 2012
Gilbane publishes Winter 2012 construction economic report
Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.
| Dec 5, 2012
Gehry-designed New York City tower receives Emporis Skyscraper Award
8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award.
| Dec 4, 2012
MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award
MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.
| Dec 4, 2012
Thornton Tomasetti opens new office in São Paulo, Brazil
The move to São Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.
| Dec 4, 2012
Sto Corp. announces new distributor in the Carolinas
Company will now have coverage in several parts of North Carolina.
| Dec 4, 2012
Wirtz Beverage Illinois’ corporate headquarters completed
WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.
| Dec 4, 2012
Wagner joins Ghafari as Manager of Structural Engineering
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.
| Dec 4, 2012
City of Gainesville to break ground on $33 million bus fleet maintenance and ops facility
The 140,000-sf facility will include dispatch, administrative and maintenance facilities.