flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Grim Hall opens the door to fire safety with fire-rated ceramic glass

Sponsored Content

Grim Hall opens the door to fire safety with fire-rated ceramic glass

To provide fire-rated doors with updated functionality in Grim Hall, the design team selected FireLite® NT ceramic glass with Fireframes® Designer Series door frames.


By Technical Glass Products Sponsored Content | May 27, 2014
Fireframes Designer Series doors in Grim Hall
Fireframes Designer Series doors in Grim Hall

Project: Lincoln University, Grim Hall
Location: Lincoln University, PA
Architect: Tevebaugh Associates
Product: FireLite® NT fire-rated glass ceramic with Fireframes® Designer Series doors 

 

For the renovation of Lincoln University’s Grim Hall life sciences building into a state-of-the-art computer facility, Tevebaugh Associates worked to provide students and faculty with improved life safety protection. Updating the 1925-era facility's fire-rated doors was an important component of the project. 

Fire-rated doors have advanced significantly in the decades since Grim Hall was first built. Materials like steel and wired fire-rated glass are no longer the only options available for use in doors designated to meet fire and life safety building codes. For example, clear and wireless fire-rated glazing can now defend against fire and provide impact resistance for high traffic areas, without restricting visibility and light transfer.

To provide fire-rated doors with updated functionality in Grim Hall, the design team selected FireLite® NT ceramic glass with Fireframes® Designer Series door frames, both from Technical Glass Products (TGP). FireLite NT is strong, able to withstand the high heat of structural fires for up to three hours and resists shattering when cool water from fire sprinklers or fire hoses strikes the hot glass during a fire. It also meets the CPSC 16CFR 1201 (Category II) safety-glazing classification to provide the highest level of required impact safety. As such, the ceramic glass can withstand a force comparable to the impact of a full-grown, fast-moving adult.

Manufactured using TGP’s ultraHD® Technology, FireLite NT features a clear and nearly colorless surface to better resemble the look of ordinary window glass and visually integrate with the school’s non-fire-rated windows and doors. It also allows the doors to draw daylight into interior spaces, while protecting students and staff from the threat of fire. 

Fireframes Designer Series fire-rated doors and frames feature narrow steel profiles that provide a sleek, modern alternative to traditional hollow metal steel frames. The frames can be powder coated to match desired project color schemes, and are available in stainless steel. The modular system is available with ratings up to 90 minutes and can be used with the FireLite family of glass products.  

For more information on FireLite ceramic glass products and ultraHD Technology, along with TGP’s other fire-rated glass and framing products, visit fireglass.com.

Technical Glass Products
800.426.0279
800.451.9857 – fax
sales@fireglass.com
fireglass.com

 


FireLite® NT fire-rated ceramic glass

Related Stories

| May 21, 2012

$61,000 awarded to students in Cleveland’s ACE Mentor Program

Mayor Frank G. Jackson gives keynote address at scholarship event for 80 Cleveland Metropolitan School District students involved in the ACE Mentor Program, which provides guidance and assistance for students interested in careers in the integrated construction industry.

| May 21, 2012

Wayne, Pa.'s Radnor Middle School wins national green award

Radnor Middle School among the most sustainable schools in the U.S.

| May 21, 2012

Winchester High School receives NuRoof system

Metal Roof Consultants attended a school board meeting and presented a sloped metal retrofit roof as an alternative to tearing off the existing roof and replacing it with another flat roof.

| May 17, 2012

EMerge Alliance forms new Campus Microgrid Technical Standards Committee

Intel leading the charge to connect multiple DC microgrids throughout commercial buildings; others invited to join effort.

| May 16, 2012

AIA issues guide to IGCC

Getting the IgCC adopted in all 50 states and in jurisdictions across the country is the primary mission of the ICC, which published the code in March.

| May 16, 2012

Architecture Billings Index reverts to negative territory

Decline is possibly a brief pause from unusually strong winter activity.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| May 16, 2012

Balfour Beatty Construction taps Kiger as VP of operations

Kiger will manage current relationships and pursue other strategic clients, including select healthcare clients and strategic project pursuits in the Central Tennessee region.

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 15, 2012

Suffolk selected for Rosenwald Elementary modernization project

The 314-student station elementary school will undergo extensive modernization.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021