Project: Lincoln University, Grim Hall
Location: Lincoln University, PA
Architect: Tevebaugh Associates
Product: FireLite® NT fire-rated glass ceramic with Fireframes® Designer Series doors
For the renovation of Lincoln University’s Grim Hall life sciences building into a state-of-the-art computer facility, Tevebaugh Associates worked to provide students and faculty with improved life safety protection. Updating the 1925-era facility's fire-rated doors was an important component of the project.
Fire-rated doors have advanced significantly in the decades since Grim Hall was first built. Materials like steel and wired fire-rated glass are no longer the only options available for use in doors designated to meet fire and life safety building codes. For example, clear and wireless fire-rated glazing can now defend against fire and provide impact resistance for high traffic areas, without restricting visibility and light transfer.
To provide fire-rated doors with updated functionality in Grim Hall, the design team selected FireLite® NT ceramic glass with Fireframes® Designer Series door frames, both from Technical Glass Products (TGP). FireLite NT is strong, able to withstand the high heat of structural fires for up to three hours and resists shattering when cool water from fire sprinklers or fire hoses strikes the hot glass during a fire. It also meets the CPSC 16CFR 1201 (Category II) safety-glazing classification to provide the highest level of required impact safety. As such, the ceramic glass can withstand a force comparable to the impact of a full-grown, fast-moving adult.
Manufactured using TGP’s ultraHD® Technology, FireLite NT features a clear and nearly colorless surface to better resemble the look of ordinary window glass and visually integrate with the school’s non-fire-rated windows and doors. It also allows the doors to draw daylight into interior spaces, while protecting students and staff from the threat of fire.
Fireframes Designer Series fire-rated doors and frames feature narrow steel profiles that provide a sleek, modern alternative to traditional hollow metal steel frames. The frames can be powder coated to match desired project color schemes, and are available in stainless steel. The modular system is available with ratings up to 90 minutes and can be used with the FireLite family of glass products.
For more information on FireLite ceramic glass products and ultraHD Technology, along with TGP’s other fire-rated glass and framing products, visit fireglass.com.
Technical Glass Products
800.426.0279
800.451.9857 – fax
sales@fireglass.com
fireglass.com
FireLite® NT fire-rated ceramic glass
Related Stories
Multifamily Housing | Jul 12, 2017
Midyear Rent Report: 26 states saw rental price increases in first half of 2017
The most notable rental increases are in growing markets in the South and Southwest: New Orleans, Glendale, Ariz., Houston, Reno, N.V., and Atlanta.
Giants 400 | Jul 12, 2017
Innovation abounds, but will it lead to growth for AEC Giants?
Engineering firms such as Arup, Glumac, and Thornton Tomasetti are leveraging their in-house expertise to develop products and tools for their design teams, clients, and even the competition.
Multifamily Housing | Jul 12, 2017
7 noteworthy multifamily projects: posh amenities, healthy living, plugged-in lifestyle
Zen meditation gardens, bocce courts, saltwater pools, and free drinks highlight the niceties at these new multifamily developments.
Accelerate Live! | Jul 6, 2017
Watch all 20 Accelerate Live! talks on demand
BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.
Healthcare Facilities | Jun 29, 2017
Uniting healthcare and community
Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.
Architects | Jun 25, 2017
Stantec adds RNL Design to its stable, fortifying several of its business units
The engineering giant also names successor to CEO who will retire at the end of this year.
Building Team | Jun 22, 2017
Seven lessons learned on commissioning projects
Commissioning is where the rubber meets the road in terms of building design.
Sponsored | Building Team | Jun 20, 2017
Plan ahead when building in the west
Getting a project through plan review can be an unusually long process, anywhere from six months to two years.
Architects | Jun 19, 2017
Preparing to negotiate: Get your head in the game
Logical and well-planned steps to effective negotiation.
| Jun 13, 2017
Accelerate Live! talk: Is the road to the future the path of least resistance? Sasha Reed, Bluebeam (sponsored)
Bluebeam’s Sasha Reed discusses why AEC leaders should give their teams permission to responsibly break things and create ecosystems of people, process, and technology.