Project: Lincoln University, Grim Hall
Location: Lincoln University, PA
Architect: Tevebaugh Associates
Product: FireLite® NT fire-rated glass ceramic with Fireframes® Designer Series doors
For the renovation of Lincoln University’s Grim Hall life sciences building into a state-of-the-art computer facility, Tevebaugh Associates worked to provide students and faculty with improved life safety protection. Updating the 1925-era facility's fire-rated doors was an important component of the project.
Fire-rated doors have advanced significantly in the decades since Grim Hall was first built. Materials like steel and wired fire-rated glass are no longer the only options available for use in doors designated to meet fire and life safety building codes. For example, clear and wireless fire-rated glazing can now defend against fire and provide impact resistance for high traffic areas, without restricting visibility and light transfer.
To provide fire-rated doors with updated functionality in Grim Hall, the design team selected FireLite® NT ceramic glass with Fireframes® Designer Series door frames, both from Technical Glass Products (TGP). FireLite NT is strong, able to withstand the high heat of structural fires for up to three hours and resists shattering when cool water from fire sprinklers or fire hoses strikes the hot glass during a fire. It also meets the CPSC 16CFR 1201 (Category II) safety-glazing classification to provide the highest level of required impact safety. As such, the ceramic glass can withstand a force comparable to the impact of a full-grown, fast-moving adult.
Manufactured using TGP’s ultraHD® Technology, FireLite NT features a clear and nearly colorless surface to better resemble the look of ordinary window glass and visually integrate with the school’s non-fire-rated windows and doors. It also allows the doors to draw daylight into interior spaces, while protecting students and staff from the threat of fire.
Fireframes Designer Series fire-rated doors and frames feature narrow steel profiles that provide a sleek, modern alternative to traditional hollow metal steel frames. The frames can be powder coated to match desired project color schemes, and are available in stainless steel. The modular system is available with ratings up to 90 minutes and can be used with the FireLite family of glass products.
For more information on FireLite ceramic glass products and ultraHD Technology, along with TGP’s other fire-rated glass and framing products, visit fireglass.com.
Technical Glass Products
800.426.0279
800.451.9857 – fax
sales@fireglass.com
fireglass.com
FireLite® NT fire-rated ceramic glass
Related Stories
Building Team | Jul 12, 2022
10 resource reduction measures for more efficient and sustainable biopharma facilities
Resource reduction measures are solutions that can lead to lifecycle energy and cost savings for a favorable return on investment while simultaneously improving resiliency and promoting health and wellness in your facility.
Office Buildings | Jul 12, 2022
Miami office tower nears completion, topping off at 55 stories
In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion.
University Buildings | Jul 11, 2022
Student life design impacts campus wellness
As interior designers, we have the opportunity and responsibility to help students achieve deeper levels of engagement in their learning, social involvement, and personal growth on college campuses.
Museums | Jul 11, 2022
Denmark opens a museum that tells the stories of refugees worldwide
Located on the site of Denmark’s largest World War II refugee camp, the new Refugee Museum of Denmark, FLUGT, tells the stories of refugees from the camp as well as refugees worldwide.
Codes and Standards | Jul 8, 2022
Inefficient supply chains, outdated project delivery systems hamper construction investment
Constructing and justifying the cost of physical assets such as a manufacturing plant is much more difficult than it was decades ago, according to a report by Steffen Fuchs, senior partner with McKinsey & Company.
Airports | Jul 8, 2022
Phoenix Sky Harbor Airport’s new terminal prioritizes passenger experience and sustainability
McCarthy Building Companies recently completed construction of the final concourse in Terminal 4 at Phoenix Sky Harbor International Airport.
Architects | Jul 7, 2022
Page acquires AE giant EYP to form 1,300-person international design firm
The combined firm will “be able to invest in research and thought leadership to co-create with our clients,” stated Page CEO Thomas McCarthy.
Building Team | Jul 7, 2022
Report explores improving architect/contractor relationship
A new study by the American Institute of Architects and the Associated General Contractors of America focuses on improving the relationship between architects and contractors.
Airports | Jul 7, 2022
Love at first flight: The power of first impressions in airports
As architects, how we design a terminal and choreograph the passenger experience can stir up strong feelings.
Building Team | Jul 7, 2022
Amenity-rich rental property in Chicago includes seven-story atrium with vertical landscaping
The recently opened 198-unit Optima Lakeview luxury rental apartment building in Chicago is bursting with amenities such as the region’s first year-round rooftop pool, contact-free in-home package delivery, housekeeping services, on-site room service, fitness programming, and a virtual personal assistant.