flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Griffin Electric completes Medical University of South Carolina project

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.


By By BD+C Staff | February 28, 2012
Griffin Electric performed the installation of a 15KV service and switches, as w
Griffin Electric performed the installation of a 15KV service and switches, as well as, a switchboard and standby generator for

Wayne J. Griffin Electric, Inc. recently completed the electrical installation work for the Medical University of South Carolina’s Drug Discovery and Bioengineering buildings in Charleston, S.C.

Officially named the James E. Clyburn Research Center on October 21, the 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University. Research for pharmacology, pharmaceutical sciences, tissue regeneration, bioengineering, and cancer is performed on-site, including a dedicated animal imaging center for CT, PET, and MRI optical imaging.

Griffin Electric performed the installation of a 15KV service and switches, as well as, a switchboard and standby generator for this project.

Also, the team was responsible for setting up the buildings’ life safety fire alarm and advanced energy management lighting control systems.

Brasfield & Gorrie, LLC, of Atlanta, GA, led the construction team, while Stevens & Wilkinson SC, Inc., of Columbia, SC, performed the architectural and electrical design services. BD+C

Related Stories

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 8, 2012

BD+C wins six B2B journalism awards

BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.

| Aug 8, 2012

BIM’s future up in the cloud

The AEC industry is on the cusp of a still more significant evolution with cloud computing.

| Aug 8, 2012

Giants 300 Sports Facilities Report

BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.

| Aug 8, 2012

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.

| Aug 7, 2012

Pioneering revival

Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021