Wayne J. Griffin Electric, Inc. recently completed the electrical installation work for the Medical University of South Carolina’s Drug Discovery and Bioengineering buildings in Charleston, S.C.
Officially named the James E. Clyburn Research Center on October 21, the 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University. Research for pharmacology, pharmaceutical sciences, tissue regeneration, bioengineering, and cancer is performed on-site, including a dedicated animal imaging center for CT, PET, and MRI optical imaging.
Griffin Electric performed the installation of a 15KV service and switches, as well as, a switchboard and standby generator for this project.
Also, the team was responsible for setting up the buildings’ life safety fire alarm and advanced energy management lighting control systems.
Brasfield & Gorrie, LLC, of Atlanta, GA, led the construction team, while Stevens & Wilkinson SC, Inc., of Columbia, SC, performed the architectural and electrical design services. BD+C
Related Stories
| May 14, 2013
Paints and coatings: The latest trends in sustainability
When it comes to durability, a 50-year building design ideally should include 50-year coatings. Many building products consume substantial amounts of energy, water, and petrochemicals during manufacture, but they can make up for it in the operations phase. The same should be expected from architectural coatings.
| May 14, 2013
Advanced turbines generate 6X more energy than conventional models
US-based wind energy company SheerWind just unveiled the INVELOX – a tunnel-based wind turbine that can produce up to 600% more power than traditional wind turbines.
| May 14, 2013
Raymond Clark joins HOK’s Chicago Practice as Management Principal
HOK announced today that Raymond Clark, AIA, LEED AP, has joined its leadership team in Chicago as senior vice president and management principal.
| May 14, 2013
Easy net-zero energy buildings [infographic]
"Be a Zero Hero" infographic educates building industry professionals on ultra energy-efficient structural insulated panel construction
| May 9, 2013
10 high-efficiency plumbing fixtures
From a "no sweat" toilet to a deep-well lavatory, here's a round up of the latest high-efficiency plumbing fixtures.
| May 9, 2013
Post-tornado Greensburg, Kan., leads world in LEED-certified buildings per capita
Six years after a tornado virtually wiped out the town, Greensburg, Kan., is the world's leading community in LEED-certified buildings per capita.
| May 8, 2013
Preventable curtain wall failures - AIA/CES course
In many cases, curtain wall failures are caused by fairly simple errors that occur during the fabrication and installation process. This presentation will highlight common errors and when they typically occur.
| May 8, 2013
NBBJ appoints Tim Leberecht Chief Marketing Officer
NBBJ, a global architecture and design firm, today announced that it has appointed Tim Leberecht as its Chief Marketing Officer. Leberecht joins NBBJ from Frog Design where he led the marketing organization from 2006 to 2013 and helped transform the company into one of the world’s foremost design and innovation consultancies.
| May 7, 2013
First look: Golden State Warriors stadium by Snøhetta, AECOM
Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco.Â