Wayne J. Griffin Electric, Inc. (Griffin Electric) ecently completed the electrical installation work at the new Life Sciences Center at Gwinnett Technical College in Lawrenceville, Ga.
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices. Constructed due to the growing need for additional trained workers in the healthcare and life sciences fields, the addition of the Life Sciences Center will enable the College to serve more students, expand current programs like Nursing, and offer new programs in Cardiovascular Technology, Diagnostic Sonography and Health Information Technology.
The Griffin Electric team was responsible for installing a 2,000 amp service, 100KW natural gas generator, as well as, several systems on-site, including fire alarm, low voltage tele/data and lighting control for over 1,000 light fixtures.
Barton Malow Company of Alpharetta provided the Construction Management services for this project, while Cooper Cary, Inc. of Atlanta was the Architect, and ENG Group of Lilburn the Electrical Engineer. BD+C
Related Stories
| May 7, 2012
2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital
How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.
| May 3, 2012
2012 BUILDING TEAM AWARDS: Rush University Medical Center
This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.
| May 3, 2012
U of Michigan team looking to create highly efficient building envelope designs
The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.
| May 3, 2012
Best commercial modular buildings and marketing programs recognized
Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.
| May 3, 2012
Zero Energy Research Lab opens at North Texas
The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.
| May 3, 2012
NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes
New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.
| May 3, 2012
Gilbane to provide CM services for North Reading’s integrated middle/high school
The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.
| May 3, 2012
Ground broken for $94 million hospital expansion at Scripps Encinitas
New facility to more than double emergency department size, boost inpatient beds by 43%.