flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Griffin Electric completes electrical work at Cary Arts Center

Griffin Electric completes electrical work at Cary Arts Center


By By BD+C Staff | November 14, 2011
Griffin Electric Cary Arts Center fire pump chiller handler elevators
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service a

Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the new Cary Arts Center, located in Cary, NC. 

Opened this spring, the former Cary Elementary/High School is the site of this new arts center, encompassing 48,000-sf.  A complete renovation of the former learning institution, the updated building includes rooms for classes, studio, rehearsal and performance, plus office space for visual arts, ceramic arts, and performing arts. 

A spacious lobby welcomes visitors and patrons, with an adjacent gallery space.  Also on the main floor is a concession area and 399-seat theater, in addition to three classrooms, which may also be used for lobby overflow. Furthermore, this level has the addition of a fly tower, which allows for theater sets to be built and stored on-site. The lower level of the building includes classrooms for ceramics, wood and fabric shops. The upper level, comprised of five classrooms, also includes rehearsal and conference rooms.

The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

Additionally, the team installed several new systems including, fire alarm, security and public address, lighting control and lightning protection.  A new state-of-the-art performance lighting system was furnished for the theater and rehearsal rooms, in addition to three new dimmer racks and smart switches within the main control room for the performance lighting system. BD+C

Related Stories

| Mar 4, 2014

If there’s no ‘STEM crisis,’ why build more STEM schools?

Before you get your shorts in a knot, I have nothing against science, technology, engineering, or even mathematics; to the contrary, I love all four “STEM” disciplines (I’m lying about the math). But I question whether we need to be building K-12 schools that overly emphasize or are totally devoted to STEM.

| Mar 3, 2014

Negotiate your way to success

There are few business skills as important as negotiation. Many successful businesspeople pride themselves on their ability to turn a deal in their favor.  Here are a few key negotiation principles to ensure you’re generally getting a good deal.

| Mar 3, 2014

5 ways to gain clients you actually like

Gaining more clients is one thing. Gaining more clients that you actually like is something else entirely. Here are some tips to perfect the art of attracting and retaining clients that you enjoy working with. 

| Mar 3, 2014

Engineering and construction CEOs are cautiously optimistic about the global economy, says PwC

Firm leaders remain leery about the availability of skilled workers, the state of government debt and deficits, and rising material prices, according to PwC’s 2014 Global CEO Survey.

| Mar 1, 2014

Dramatic fractal roof highlights SOM's new Mumbai airport terminal [slideshow]

The terminal merges new technology and traditional regional architecture, notably in the fractal roof canopy that runs throughout the terminal. 

| Feb 28, 2014

Six finalists selected in design competition for Canadian Holocaust monument

David Adjaye and Daniel Libeskind are among the finalists for the National Holocaust Monument, planned near the Canadian War Museum in Ottawa.

| Feb 27, 2014

Gensler reveals 44 design trends for the next decade

The 82-page report covers dozens of emerging trends in healthcare, commercial office, hospitality, tall buildings, and more.

| Feb 27, 2014

Target converts former prison dump into latest big-box store

Target's new San Rafael, Calif., location was built on the site of the former San Quentin prison dump. 

| Feb 27, 2014

Open or private offices? It depends on the business plan

Open layouts are grabbing headlines as a hallmark of the new workplace—think the Google campus or Facebook's headquarters. And for smaller-scale operations, open designs are often lauded for being less expensive than private office plans. But does that mean all offices should have an open layout?

| Feb 27, 2014

3 reasons to apply computational fluid dynamics on your next project

From right-sizing mechanical systems to understanding the impact of design alternatives, CFD offers a host of benefits for the Building Team. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021