flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Greystar’s The Pullman is a new mixed-use apartment community in Denver

Multifamily Housing

Greystar’s The Pullman is a new mixed-use apartment community in Denver

The Mulhern Group designed the project.


By David Malone, Managing Editor | July 15, 2021
The Pullman exterior
The Pullman exterior

The Pullman is a new luxury apartment and retail community located in the heart of Denver’s Union Station neighborhood. The community was built for walkability and is just steps away from numerous shopping and dining options and the Beaux Arts style Union Station transport hub.

The 168-unit boutique community offers one-, two-, and three-bedroom residences (as well as two-story penthouses) ranging from 819 to 3,784 sf. The community is anchored by a hotel-style lobby and features a variety of amenities including an 8,000-sf rooftop pool and spa terrace, an outdoor kitchen and dining area, a state-of-the-art fitness room and yoga studio, a billiards lounge with a wet bar, a pet spa, bike storage, a demonstration kitchen, a members-only club room, and a coffee and tea bar.

 

The Pullman pool and spa terrace

 

Residences include KitchenAid Gas Cooktops and quartz countertops, engineered hardwood flooring, and custom wood cabinetry. The penthouse suites include in-wall fireplaces, secondary butler’s entrances, full body showers, and Wolf and Subzero appliances.

 

The Pullman billiards room

 

A lifestyle team coordinates on-site events and activities as well as offering services such as package delivery, wake-up calls, and shoe shines. Additionally, The Pullman includes 3,500 sf of ground floor retail and above- and below-ground structured parking for 212 vehicles.

Greystar owns and operates The Pullman. The Mulhern Group designed the project.

 

The Pullman living space

Related Stories

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Multifamily Housing | Apr 15, 2020

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.

Coronavirus | Apr 5, 2020

COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021