flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gregory Hodkinson appointed head of Arup Group

Gregory Hodkinson appointed head of Arup Group

Gregory Hodkinson joined Arup in 1972, having been inspired by the firm's work on the Sydney Opera House. 


By Arup  | April 9, 2014
Arup announced that Gregory Hodkinson will take over the role of Chairman. Hodkinson is joined by Deputy Chairmen Tristram Carfrae and David Whittleton. Together they will lead a global group of more than 11,500 staff members with turnover in excess of $1.7 billion.
 
"Arup's strategy is quite simply to deliver the best quality work for our clients across all sectors," Hodkinson explains. "I believe that we have the right people with the right skills to add even more value in vitally important areas such as resilient city development, transport, water and low-carbon energy, so that's where we aim to refine our focus."
 
Hodkinson has spent his professional career at Arup and is a passionate believer in Arup's mission to 'shape a better world'. He brings more than 40 years' experience in large-scale projects to the new role, including several in the US and Canada: JetBlue, British Airways and Delta Airlines terminals at JFK International in New York; New Terminal Development for Toronto's Pearson International Airport; Fulton Street Transit Center, and Second Avenue Subway in New York.
 
Gregory Hodkinson joined Arup in 1972, having been inspired by the firm's work on the Sydney Opera House. He worked on major urban development and transport projects in Australia and the UK, before leading the firm's expansion in the US in 1988 as a Founding Principal of the New York office. Hodkinson became Chairman of the Americas Region in 2004, a role now held by Mahadev Raman. In 2011, Hodkinson moved to Milan to lead the firm's European business and was subsequently appointed Chairman of the global Group by the Arup Trustees as of April 1, 2014.
 

Tags

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021