North American design firm Stantec announced plans to acquire Mid-Atlantic-based engineering firm Greenhorne & O’Mara. The multidiscipline, 520-person firm will expand Stantec’s presence and services across the U.S. Atlantic coast, particularly in the transportation sector and with the US federal government. The transaction is expected to close by the end of the year, marking the third firm to join Stantec in the last quarter of 2012.
Headquartered in Laurel, Md., with 16 offices spread throughout the Mid-Atlantic and Southeast regions, Greenhorne & O’Mara specializes in the design of transportation facilities and other infrastructure, including highway and bridge design, traffic engineering, master planning and landscape architecture, structural engineering, U.S. Department of Defense services, and utilities design. Their work also includes particular expertise in water resource projects with U.S. federal agencies, such as flood hazard mitigation and floodplain mapping, National Environmental Policy Act (NEPA) compliance, wetlands delineation and permitting, environmental impact statements, and stormwater management.
Stantec also announced the completion of its acquisition of C3TS, a Florida engineering and design firm with 150 employees. The move established a much stronger presence for Stantec on Florida’s Atlantic coast, bringing total staff in the state to more than 350 in 12 offices. +
Related Stories
| Jan 4, 2012
Shawmut Design & Construction awarded dorm renovations at Brown University
Construction is scheduled to begin in June 2012, and will be completed by December 2012.
| Jan 4, 2012
Skanska acquires Industrial Contractors
Industrial Contractors Inc. is a contractor in the commercial, industrial and power markets of the Midwest. The company employs 2,400 people and in 2011 the revenues are estimated to be approximately $500 million.
| Jan 4, 2012
HDR to design North America’s first fully digital hospital
Humber River is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.
| Jan 4, 2012
New LEED Silver complex provides space for education and research
The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.
| Jan 3, 2012
Gilbane awarded $88M Contract for Ohio elementary school construction
The new award, which comprises the construction of five new elementary schools and demolition of 11 older facilities, is the latest K-12 building program managed by Gilbane for the Ohio School Facilities Commission since 1998.
| Jan 3, 2012
AIA's ABI November Index reaches 52.0
The Architecture Billings Index (ABI) reached its first positive mark since August.
| Jan 3, 2012
Callison acquires Barteluce Architects & Associates
This acquisition will grow Callison’s New York team to over 75 architects.
| Jan 3, 2012
VDK Architects merges with Harley Ellis Devereaux
Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.
| Jan 3, 2012
Weingarten, Callan appointed to BD+C Editorial Board
Building Design+Construction has named two new members to its editorial board. Both are past recipients of BD+C’s “40 Under 40” honor.
| Jan 3, 2012
New Chicago hospital prepared for pandemic, CBR terror threat
At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.