North American design firm Stantec announced plans to acquire Mid-Atlantic-based engineering firm Greenhorne & O’Mara. The multidiscipline, 520-person firm will expand Stantec’s presence and services across the U.S. Atlantic coast, particularly in the transportation sector and with the US federal government. The transaction is expected to close by the end of the year, marking the third firm to join Stantec in the last quarter of 2012.
Headquartered in Laurel, Md., with 16 offices spread throughout the Mid-Atlantic and Southeast regions, Greenhorne & O’Mara specializes in the design of transportation facilities and other infrastructure, including highway and bridge design, traffic engineering, master planning and landscape architecture, structural engineering, U.S. Department of Defense services, and utilities design. Their work also includes particular expertise in water resource projects with U.S. federal agencies, such as flood hazard mitigation and floodplain mapping, National Environmental Policy Act (NEPA) compliance, wetlands delineation and permitting, environmental impact statements, and stormwater management.
Stantec also announced the completion of its acquisition of C3TS, a Florida engineering and design firm with 150 employees. The move established a much stronger presence for Stantec on Florida’s Atlantic coast, bringing total staff in the state to more than 350 in 12 offices. +
Related Stories
| Mar 21, 2014
Pier Carlo Bontempi to receive Richard H. Driehaus Prize from Notre Dame
Established in 2003 by the Notre Dame School of Architecture, the $200,000 Richard H. Driehaus Prize is awarded to a living architect whose work embodies the highest ideals of traditional and classical architecture in contemporary society, and creates a positive cultural, environmental and artistic impact.
| Mar 21, 2014
How to get more referrals
If you’re having a hard time attracting new referrals, here are a few techniques for increasing the number of interactions with potential clients.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
D.C. breaks ground on $2B mega waterfront development [slideshow]
When complete, the Wharf will feature approximately 3 million sf of new residential, office, hotel, retail, cultural, and public uses, including waterfront parks, promenades, piers, and docks.
| Mar 20, 2014
13 dazzling wood building designs [slideshow]
From bold structural glulam designs to striking textured wall and ceiling schemes, these award-winning building projects showcase the design possibilities using wood.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Mar 19, 2014
Architecture Billings Index shows slight improvement
The American Institute of Architects (AIA) reported that the February ABI score was 50.7, up slightly from a mark of 50.4 in January.
| Mar 19, 2014
Gehry, Zaha, Foster, Meier: Vote for your top 'starchitect' in this March Madness design legends tourney
Fast Company's Bracket Madness tournament pits 32 designers against each other to see who truly is the world's greatest living designer.
| Mar 19, 2014
Is it time to start selecting your own clients?
Will 2014 be the year that design firms start selecting the clients they want rather than getting in line with competitors to respond to RFPs? That’s the question posed by a recent thought-provoking article.
| Mar 19, 2014
How to develop a healthcare capital project using a 'true north charter'
Because healthcare projects take years to implement, developing a true north charter is essential for keeping the entire team on track and moving in the right direction.