Next week’s Greenbuild Conference & Expo in Los Angeles will include its first-ever program specifically for an infrastructure project, the Expo Light Rail Phase 2, which completes the public transit connection between L.A. and Santa Monica, Calif.
The 6.6-mile project is an extension of the existing 80-station Metro Rail system across L.A. County. The extension adds seven at-grade stations between Culver City and Santa Monica.
Phase 2 has been designed to minimize their environmental impact. This is the first transit project—and, at more than $700 million, the largest project at contract value—to achieve Envision Platinum certification from the Institute of Sustainable Infrastructure.
Administered by ISI, Envision consists of a broad range of criteria that address a project’s impact on the surrounding community and environment, technical considerations regarding materials and processes, and other critical choices spanning the project’s lifecycle.
A joint venture between Skanska and Steve P. Rados Construction started this project in 2012. The extension opened on May 20, 2016. The rail line now connects the city of Los Angeles to its beaches in approximately 46 minutes. The system also integrates with other means of transit, such as buses and nearly five miles of parallel bike paths.
Skanska USA Civil has committed that, by 2020, all of its projects will seek Envision certification.
Greenbuild attendees will be able to tour the project at 8 a.m. on Monday, October 3.
The total cost of Expo Light Rail Phase 2 was $1.6 billion, funded in large part by Measure R, passed in 2008, a 30-year, half-cent sales tax increase that kickstarted a public transit construction boom. When the Metro’s Regional Connector subway is completed, around 2021, Expo will link East Los Angeles to downtown Santa Monica.
Related Stories
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| May 1, 2014
Super BIM: 7 award-winning BIM/VDC-driven projects
Thom Mayne's Perot Museum of Nature and Science and Anaheim's new intermodal center are among the 2014 AIA TAP BIM Award winners.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Free transit for everyone! Then again, maybe not
An interesting experiment is taking place in Tallinn, the capital of Estonia, where, for the last year or so, its 430,000 residents have been able to ride the city’s transit lines practically for free. City officials hope to pump up ridership by 20%, cut carbon emissions, and give low-income Tallinnites greater access to job opportunities. But is it working?
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.