flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Greenbuild 2012 Report: Hospitality

Greenbuild 2012 Report: Hospitality

Hotel boom signals good news for greener lodging facilities


By By Amy McIntosh, Associate Editor, Raissa Rocha, Associate Editor, and Rob Cassidy, Editorial Director | November 11, 2012
A ceiling-high stone fireplace framed by rustic wooden logs was created by artis
A ceiling-high stone fireplace framed by rustic wooden logs was created by artisans for the Hyatt Regency Minneapolis. Elsewhere
This article first appeared in the November 2012 issue of BD+C.

Hotels are expected to spend $5 billion on improvements this year, 33% more than in 2011, says Bjorn Hanson, a dean at NYU’s Robert Tisch Center for Hospitality, Tourism and Sports Management. Most of that windfall will go into new bedding and flat-screen TVs, but a lot will go toward room renovations, lobby upgrades, additions, and new construction, including sustainably conceived projects.

For the Sheraton New York, Stantec oversaw a $153 million renovation that addressed energy waste and guest discomfort (due primarily to an wayward HVAC system) in the 53-story hotel. All 1,754 guestrooms were completely renovated with new systems that returned comfort control to guests. New central plant systems and 15 miles of hydronic piping were installed, cutting energy consumption by 14%.

A different approach to sustainability was taken by design firm Stonehill & Taylor for the recently completed $25 million renovation of the 533-room Hyatt Regency Minneapolis. Here, the emphasis was on the use of local materials and services whenever possible. Stone from a nearby quarry was used for bathroom countertops. Guestrooms feature works by local artists. About 80% of the furniture, fixtures, and equipment were produced in the U.S. and Canada. +

Related Stories

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021