flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field


By By BD+C Staff | October 7, 2011
UL Environment, Inc., released a White Paper to help educate all stakeholders about Environmental Product Declarations (EPDs) an

UL Environment Inc. released a White Paper to help educate all stakeholders about Environmental Product Declarations (EPDs) and help clarify the role of the EPD Program Operator. The new guidance document, “Transparency and the Role of Environmental Product Declarations,” accompanies the announcement of newly certified EPDs for Interface and Kingspan Insulated Metal Panels and release of a Thermal Building Envelope Insulation Product Category Rule.

The report – available here – provides guidance on:

  • Market demand for EPDs;
  • ISO 14025 compliant EPD creation process;
  • Importance of  life cycle analysis in the EPD creation process;
  • Why Product Category Rules (PCRs) needed;
  • Necessity for PCR harmonization;
  • Role of the EPD Program Operator; and
  • What’s next for EPDs, including the management of public data.

An EPD is an internationally accepted, third-party reviewed report detailing a product’s environmental impacts throughout its lifecycle, and often include additional performance, health, and company information. EPDs promote transparency and facilitate comparison of impacts among products in the same category.

Life cycle-based assessment tools are rapidly being embraced by the construction and building industry as an emerging component of green building certification processes. EPDs are currently rewarded by various green building rating systems such as CHPS and BREEAM. The USGBC recently started to recognize EPDs through Pilot Credit 43 and the draft version of the LEED 2012 includes credits that encourage the use of EPDs. BD+C

Related Stories

| Oct 1, 2012

Tyco completes separation process, now largest pure-play fire protection and security business

Tyco Integrated Security focused on delivering security solutions to commercial businesses.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 26, 2012

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

| Sep 24, 2012

Chicago Lakeside shortlisted for the Sustainia Award

The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 21, 2012

AAMA and WDMA release updated review and forecast that predicts industry trends

Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.

| Sep 20, 2012

Mid-box retail study shows lack of available sites in Chicago

Existing supply is tight everywhere and almost non-existent in the most attractive zones.

| Sep 20, 2012

Forrester begins construction of freestanding cancer center in Montgomery County, Md.

The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021