flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes

GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes


By By BD+C Staff | October 5, 2011
All tile produced by Crossville will contain certified recycled content.

 

Crossville Inc. announced that it has become the first tile manufacturer in the U.S. to achieve certification of its waste recycling programs through Scientific Certification Systems, an independent, third-party certifier of recycled claims. Now all tile produced by Crossville will contain certified recycled content.

Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware. All Crossville-produced products will now contain a minimum of 4% recycled content from TOTO, in addition to varying percentages of its own filtrate and fired waste. This material from TOTO has been recently certified by SCS as part of Crossville’s Fired Waste Process, marking the latest development in Crossville’s Recycling Processes program. BD+C

Related Stories

| Jul 21, 2011

Falling Architecture Billings Index reflects decrease in design demands

This months Architecture Billings Index (ABI), provided by the American Institute of Architects, is almost a full point lower than last month’s reported score. June’s reading of 47.2 was short of the required 50 to achieve billings increases, making July’s reading of 46.3 an unwelcome sign of market tidings.

| Jun 29, 2011

New leadership role for architects in net-zero design

BD+C Editorial Director Rob Cassidy talks with RNL Design's Tom Hootman, AIA, about the changing role of architects in net-zero designs.

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021