SMARTBIM and Vizerra launched their new collaborative software project, VIMTrek, at the Greenbuild Exposition and Conference in Toronto. The VIMTrek software can convert a fully BIM detailed standard Revit design file into an immersive collaborative 3D environment in under five minutes while retaining the BIM data.
The application is able to rapidly convert Autodesk Revit designs into immersive and interactive environments and then share these over the Internet.
The idea came from advanced technologies in the video gaming industry where hyper?fast rendering algorithms are required to produce the immersive and highly detailed environments. The industry standard architectural rendering techniques, which convert design drafts into photorealistic visuals, typically involve a laborious and time?consuming process that can take 15 hours or more to complete and requires a high degree of expertise and computing power. The results of these traditional renderings produce visually stunning but static images, allowing no interactive or, more important, collaborative capabilities because of the large file size.
The software can convert the same Revit design file into an immersive 3D environment in less than five minutes with no extra training or experience required. The new rendering process utilizes unique compression technology that makes the file one?tenth the size of a traditional render and is completely interactive, allowing designers, architects, contractors, and their clients to navigate the environment and experience the building as though they were moving through a video game. BD+C
Related Stories
| May 14, 2012
Plumbing research coalition to study drainline transport issue
The effort is aimed at determining if decreasing levels of water flow––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 14, 2012
SMPS and Deltek announce alliance
A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10
| May 11, 2012
Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings
We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.
| May 11, 2012
Chapter 9 The Key to Commissioning That Works? It Never Stops
Why commissioning for existing and renovated buildings needs to be continuous to be effective.
| May 11, 2012
Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity
What historic preservationists and energy-performance advocates can learn from each other.
| May 11, 2012
VFA to acquire Altus Group's Capital Planning division
Strategic move strengthens VFA's facilities capital planning market osition in North America.