SMARTBIM and Vizerra launched their new collaborative software project, VIMTrek, at the Greenbuild Exposition and Conference in Toronto. The VIMTrek software can convert a fully BIM detailed standard Revit design file into an immersive collaborative 3D environment in under five minutes while retaining the BIM data.
The application is able to rapidly convert Autodesk Revit designs into immersive and interactive environments and then share these over the Internet.
The idea came from advanced technologies in the video gaming industry where hyper?fast rendering algorithms are required to produce the immersive and highly detailed environments. The industry standard architectural rendering techniques, which convert design drafts into photorealistic visuals, typically involve a laborious and time?consuming process that can take 15 hours or more to complete and requires a high degree of expertise and computing power. The results of these traditional renderings produce visually stunning but static images, allowing no interactive or, more important, collaborative capabilities because of the large file size.
The software can convert the same Revit design file into an immersive 3D environment in less than five minutes with no extra training or experience required. The new rendering process utilizes unique compression technology that makes the file one?tenth the size of a traditional render and is completely interactive, allowing designers, architects, contractors, and their clients to navigate the environment and experience the building as though they were moving through a video game. BD+C
Related Stories
| May 8, 2013
Preventable curtain wall failures - AIA/CES course
In many cases, curtain wall failures are caused by fairly simple errors that occur during the fabrication and installation process. This presentation will highlight common errors and when they typically occur.
| May 8, 2013
NBBJ appoints Tim Leberecht Chief Marketing Officer
NBBJ, a global architecture and design firm, today announced that it has appointed Tim Leberecht as its Chief Marketing Officer. Leberecht joins NBBJ from Frog Design where he led the marketing organization from 2006 to 2013 and helped transform the company into one of the world’s foremost design and innovation consultancies.
| May 7, 2013
First look: Golden State Warriors stadium by Snøhetta, AECOM
Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco.
| May 7, 2013
Renovated bridge building will anchor Nashville riverfront master plan
Renovations to the former Nashville Bridge Company building were recently completed, including a newly-built modern wing. The facility has been re-dubbed The Bridge Building and now offers spaces for meetings, parties, weddings, and other events.
| May 7, 2013
First look: Adrian Smith + Gordon Gill skyscraper designed to 'confuse the wind'
The 400-meter-high, 116-story Imperial Tower in Mumbai will feature a slender, rounded form optimized to withstand the area's strong wind currents.
| May 6, 2013
SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems
SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.
| May 6, 2013
7 major multifamily residential projects in the works
A $140 million redevelopment of a landmark, 45-building apartment complex in Los Angeles is among the nation's significant multifamily developments under way.
| May 3, 2013
5 common failures in paints and coatings
As experienced designers, contractors, and owners know, most paint and coating problems are correctable, but some are especially stubborn to address. Here is a partial compendium of typical failure modes and methods for addressing the problem.