flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Software an architectural game changer

GREENBUILD 2011: Software an architectural game changer


By By BD+C Staff | October 5, 2011
The software can convert a fully BIM detailed standard Revit design file into an immersive collaborative 3D environment in under

 

SMARTBIM and Vizerra launched their new collaborative software project, VIMTrek, at the Greenbuild Exposition and Conference in Toronto. The VIMTrek software can convert a fully BIM detailed standard Revit design file into an immersive collaborative 3D environment in under five minutes while retaining the BIM data.

The application is able to rapidly convert Autodesk Revit designs into immersive and interactive environments and then share these over the Internet.

The idea came from advanced technologies in the video gaming industry where hyper?fast rendering algorithms are required to produce the immersive and highly detailed environments. The industry standard architectural rendering techniques, which convert design drafts into photorealistic visuals, typically involve a laborious and time?consuming process that can take 15 hours or more to complete and requires a high degree of expertise and computing power. The results of these traditional renderings produce visually stunning but static images, allowing no interactive or, more important, collaborative capabilities because of the large file size.

The software can convert the same Revit design file into an immersive 3D environment in less than five minutes with no extra training or experience required. The new rendering process utilizes unique compression technology that makes the file one?tenth the size of a traditional render and is completely interactive, allowing designers, architects, contractors, and their clients to navigate the environment and experience the building as though they were moving through a video game. BD+C

Related Stories

| Nov 27, 2013

Exclusive survey: Revenues increased at nearly half of AEC firms in 2013

Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 27, 2013

University reconstruction projects: The 5 keys to success

This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.

| Nov 26, 2013

7 ways to make your firm more successful

Like all professional services businesses, AEC firms are challenged to effectively manage people. And even though people can be rather unpredictable, a firm’s success doesn’t have to be. Here are seven ways to make your firm more successful in the face of market variability and uncertainty.

| Nov 26, 2013

Design-build downsized: Applying the design-build method in an era of smaller projects

Any project can benefit from the collaborative spirit and cooperative relationships embodied by design-build. But is there a point of diminishing return where the design-build project delivery model just doesn't make sense for small projects? Design-build expert Lisa Cooley debates the issue.

| Nov 25, 2013

Electronic plan review: Coming soon to a city near you?

With all the effort AEC professionals put into leveraging technology to communicate digitally on projects, it is a shame that there is often one major road block that becomes the paper in their otherwise “paperless” project: the local city planning and permitting department. 

| Nov 22, 2013

Kieran Timberlake, PE International develop BIM tool for green building life cycle assessment

Kieran Timberlake and PE International have developed Tally, an analysis tool to help BIM users keep better score of their projects’ complete environmental footprints.

| Nov 20, 2013

Architecture Billings Index slows in October; project inquiries stay strong

Following three months of accelerating demand for design services, the Architecture Billings Index reflected a somewhat slower pace of growth in October. The October ABI score was 51.6, down from a mark of 54.3 in September.

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021