flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Schools program receives grant to track student conservation results

GREENBUILD 2011: Schools program receives grant to track student conservation results


By By BD+C Staff | October 7, 2011
To track results and progress of the programs, students affiliated with the International Knowledge & Research Center for Green

The U.S. Green Building Council Georgia Chapter has been awarded a seed grant from Turner Foundation to enhance two programs, one for high schools and the other for elementary and middle schools, that will engage 200 schools for the 2011-2012 school year. The programs are part of the Chapter’s High Performance, Healthy Schools initiative, which helps schools effectively implement sustainability projects.

To track results and progress of the programs, students affiliated with the International Knowledge & Research Center for Green Building at Southern Polytechnic State University will manage data entry, including two years of historical school performance data. They will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy.

The high school program is called “Green YOUR School” and is part of the SkillsUSA Competition in partnership with the Construction Education Foundation of Georgia. Students compete by completing tasks in three areas: submission of a LEED for Existing Buildings scorecard for their school, submission of an energy audit, and the development and implementation of a student conservation program. LEED, which stands for Leadership in Energy and Environmental Design, is the green building rating system created by the USGBC.

The elementary and middle school program is a partnership with the Girls Scouts of Greater Atlanta, United Parcel Service and the USGBC Georgia Chapter. Volunteers from UPS help Girl Scout Troops establish “Sustainability Teams” in their elementary and middle schools. The teams help the school systems reduce significant costs in their operational budgets while instilling in the students improved conservation behaviors, which can also be taken home.

Sustainability Teams will be piloted during the 2011-2012 school year at Forsyth County Schools (suburban), Butts County Schools (rural) and various schools in the Atlanta area (urban). The teams will implement energy conservation, water conservation, recycling, and clean air school programs. BD+C

Related Stories

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021