flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects


By By BD+C Staff | October 7, 2011
Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the companys energy

Otis Elevator Co. announced from the Greenbuild 2011 International Conference that it has won several contracts that solidify Otis’ commitment to providing sustainable solutions for its customers.

These new wins build upon the success of the company’s "The Way To Green" initiative, a global environmental program that spans every aspect of its operations, from design and manufacturing, to end-of-life product recycling.

The most substantial of the new contracts involves supplying and installing 700 energy-efficient elevators for an immense social housing reconstruction project in Jiangsu, China, one of the largest wins in Otis’ history in the country.

Under the contract, Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the company’s energy-efficient ReGen drive technology. ReGen drives capture energy generated by the elevators and deliver it back to the building for use by other systems. 

When completed over the next two years, the project will provide elevator service to 16,000 units of housing, covering an area of approximately 2.9 million sm.

The other recent contracts to supply and install energy-efficient elevators include:

  • The Lotte World Tower in Seoul, South Korea, the world’s second tallest building, which is set to be completed in 2015. Otis will supply and install 46 elevators and escalators, including 16 energy-saving Gen2 elevators
  • The Vodafone D2 GmbH corporate headquarters in Dusseldorf, Germany. Otis will supply and install 39 elevators, including 29 Gen2 elevators.  The Gen2 elevators will feature ReGen drives that reduce energy consumption by up to 75 percent compared to conventional systems with non-regenerative drives
  • Medical technology centers in Kaliningrad, Smolensk, Barnaul and Novosibirsk, Russia. Otis will supply and install a total of 28 elevators, 25 of which will be energy-efficient Gen2 elevators. BD+C

Related Stories

Architects | Nov 10, 2022

What’s new at 173 architecture firms for 2022

More than 295 U.S. architecture and architecture-engineering (AE) firms participated in BD+C's 2022 Giants 400 survey. As part of the Giants survey process, participating firms are asked to describe their most impactful firm innovations and noteworthy company moves in the past 12 months. Here is a collection of the most compelling business and project innovations and business moves from the 2022 Architecture Giants.

Giants 400 | Nov 9, 2022

Top 30 Data Center Architecture + AE Firms for 2022

HDR, Corgan, Sheehan Nagle Hartray Architects, and Gensler top the ranking of the nation's largest data center architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report. 

Giants 400 | Nov 8, 2022

Top 110 Sports Facility Architecture and AE Firms for 2022

Populous, HOK, Gensler, and Perkins and Will top the ranking of the nation's largest sports facility architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report. 

Industry Research | Nov 8, 2022

U.S. metros take the lead in decarbonizing their built environments

A new JLL report evaluates the goals and actions of 18 cities.

Hotel Facilities | Nov 8, 2022

6 hotel design trends for 2022-2023

Personalization of the hotel guest experience shapes new construction and renovation, say architects and construction experts in this sector.

Green | Nov 8, 2022

USGBC and IWBI will develop dual certification pathways for LEED and WELL

The U.S. Green Building Council (USGBC) and the International WELL Building Institute (IWBI) will expand their strategic partnership to develop dual certification pathways for LEED and WELL.

Reconstruction & Renovation | Nov 8, 2022

Renovation work outpaces new construction for first time in two decades

Renovations of older buildings in U.S. cities recently hit a record high as reflected in architecture firm billings, according to the American Institute of Architects (AIA).

Sponsored | Steel Buildings | Nov 7, 2022

Steel structures offer faster path to climate benefits

Faster delivery of buildings isn’t always associated with sustainability benefits or long-term value, but things are changing. An instructive case is in the development of steel structures that not only allow speedier erection times, but also can reduce embodied carbon and create durable, highly resilient building approaches.

Building Team | Nov 7, 2022

U.S. commercial buildings decreased energy use intensity from 2012 to 2018

The recently released 2018 Commercial Buildings Energy Consumption Survey (CBECS) by the U.S. Energy Information Administration found that the total floorspace in commercial buildings has increased but energy consumption has not, compared with the last survey analyzing the landscape in 2012.

Sports and Recreational Facilities | Nov 7, 2022

Gilbane, Turner, Populous tapped to design and build new Buffalo Bills stadium

The joint venture of Gilbane Building Company and Turner Construction Company, in association with 34 Group, has been selected to provide construction management of the planned new NFL stadium for the Buffalo Bills in Orchard Park, N.Y. The project team also includes the project management firm, Legends Project Development, and Populous as the designer. 

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021