Otis Elevator Co. announced from the Greenbuild 2011 International Conference that it has won several contracts that solidify Otis’ commitment to providing sustainable solutions for its customers.
These new wins build upon the success of the company’s "The Way To Green" initiative, a global environmental program that spans every aspect of its operations, from design and manufacturing, to end-of-life product recycling.
The most substantial of the new contracts involves supplying and installing 700 energy-efficient elevators for an immense social housing reconstruction project in Jiangsu, China, one of the largest wins in Otis’ history in the country.
Under the contract, Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the company’s energy-efficient ReGen drive technology. ReGen drives capture energy generated by the elevators and deliver it back to the building for use by other systems.
When completed over the next two years, the project will provide elevator service to 16,000 units of housing, covering an area of approximately 2.9 million sm.
The other recent contracts to supply and install energy-efficient elevators include:
- The Lotte World Tower in Seoul, South Korea, the world’s second tallest building, which is set to be completed in 2015. Otis will supply and install 46 elevators and escalators, including 16 energy-saving Gen2 elevators
- The Vodafone D2 GmbH corporate headquarters in Dusseldorf, Germany. Otis will supply and install 39 elevators, including 29 Gen2 elevators. The Gen2 elevators will feature ReGen drives that reduce energy consumption by up to 75 percent compared to conventional systems with non-regenerative drives
- Medical technology centers in Kaliningrad, Smolensk, Barnaul and Novosibirsk, Russia. Otis will supply and install a total of 28 elevators, 25 of which will be energy-efficient Gen2 elevators. BD+C
Related Stories
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.