flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects


By By BD+C Staff | October 7, 2011
Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the companys energy

Otis Elevator Co. announced from the Greenbuild 2011 International Conference that it has won several contracts that solidify Otis’ commitment to providing sustainable solutions for its customers.

These new wins build upon the success of the company’s "The Way To Green" initiative, a global environmental program that spans every aspect of its operations, from design and manufacturing, to end-of-life product recycling.

The most substantial of the new contracts involves supplying and installing 700 energy-efficient elevators for an immense social housing reconstruction project in Jiangsu, China, one of the largest wins in Otis’ history in the country.

Under the contract, Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the company’s energy-efficient ReGen drive technology. ReGen drives capture energy generated by the elevators and deliver it back to the building for use by other systems. 

When completed over the next two years, the project will provide elevator service to 16,000 units of housing, covering an area of approximately 2.9 million sm.

The other recent contracts to supply and install energy-efficient elevators include:

  • The Lotte World Tower in Seoul, South Korea, the world’s second tallest building, which is set to be completed in 2015. Otis will supply and install 46 elevators and escalators, including 16 energy-saving Gen2 elevators
  • The Vodafone D2 GmbH corporate headquarters in Dusseldorf, Germany. Otis will supply and install 39 elevators, including 29 Gen2 elevators.  The Gen2 elevators will feature ReGen drives that reduce energy consumption by up to 75 percent compared to conventional systems with non-regenerative drives
  • Medical technology centers in Kaliningrad, Smolensk, Barnaul and Novosibirsk, Russia. Otis will supply and install a total of 28 elevators, 25 of which will be energy-efficient Gen2 elevators. BD+C

Related Stories

| Mar 21, 2012

10 common data center surprises

Technologies and best practices provide path for better preparation.

| Mar 21, 2012

ABI remains positive for fourth straight month

Highest spike in inquiries for new projects since 2007.

| Mar 21, 2012

Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms. 

| Mar 21, 2012

Clary, Hendrickson named regional directors for HDR Architecture

New directors will be responsible for expanding and strengthening the firm throughout the central region. 

| Mar 20, 2012

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.

| Mar 20, 2012

Ceco Building Systems names Romans marketing director

Romans joins Ceco Building Systems with over 15 years in marketing and customer service.

| Mar 20, 2012

UT Arlington launches David Dillon Center for Texas Architecture

Symposium about Texas architecture planned for April.

| Mar 20, 2012

Stanford’s Knight Management Center Awarded LEED Platinum

The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.

| Mar 20, 2012

New office designs at San Diego’s Sunroad Corporate Center

Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.

| Mar 19, 2012

Obama’s positioned to out-regulate Bush in second term

Proposed ozone rule would cost $19 billion to $90 billion in 2020, according to the White House.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021