flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects


By By BD+C Staff | October 7, 2011
Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the companys energy

Otis Elevator Co. announced from the Greenbuild 2011 International Conference that it has won several contracts that solidify Otis’ commitment to providing sustainable solutions for its customers.

These new wins build upon the success of the company’s "The Way To Green" initiative, a global environmental program that spans every aspect of its operations, from design and manufacturing, to end-of-life product recycling.

The most substantial of the new contracts involves supplying and installing 700 energy-efficient elevators for an immense social housing reconstruction project in Jiangsu, China, one of the largest wins in Otis’ history in the country.

Under the contract, Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the company’s energy-efficient ReGen drive technology. ReGen drives capture energy generated by the elevators and deliver it back to the building for use by other systems. 

When completed over the next two years, the project will provide elevator service to 16,000 units of housing, covering an area of approximately 2.9 million sm.

The other recent contracts to supply and install energy-efficient elevators include:

  • The Lotte World Tower in Seoul, South Korea, the world’s second tallest building, which is set to be completed in 2015. Otis will supply and install 46 elevators and escalators, including 16 energy-saving Gen2 elevators
  • The Vodafone D2 GmbH corporate headquarters in Dusseldorf, Germany. Otis will supply and install 39 elevators, including 29 Gen2 elevators.  The Gen2 elevators will feature ReGen drives that reduce energy consumption by up to 75 percent compared to conventional systems with non-regenerative drives
  • Medical technology centers in Kaliningrad, Smolensk, Barnaul and Novosibirsk, Russia. Otis will supply and install a total of 28 elevators, 25 of which will be energy-efficient Gen2 elevators. BD+C

Related Stories

MFPRO+ News | Jun 24, 2024

‘Yes in God’s Backyard’ movement could create more affordable housing

The so-called “Yes in God’s Backyard” (YIGBY) movement, where houses of worship convert their properties to housing, could help alleviate the serious housing crisis affecting many communities around the country.

Student Housing | Jun 20, 2024

How student housing developments are evolving to meet new expectations

The days of uninspired dorm rooms with little more than a bed and a communal bathroom down the hall are long gone. Students increasingly seek inclusive design, communities to enhance learning and living, and a focus on wellness that encompasses everything from meditation spaces to mental health resources.

Museums | Jun 20, 2024

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 

Building Technology | Jun 18, 2024

Could ‘smart’ building facades heat and cool buildings?

A promising research project looks at the possibilities for thermoelectric systems to thermally condition buildings, writes Mahsa Farid Mohajer, Sustainable Building Analyst with Stantec.

University Buildings | Jun 18, 2024

UC Riverside’s new School of Medicine building supports team-based learning, showcases passive design strategies

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Created by the design-build team of CO Architects and Hensel Phelps, the medical school’s new home supports team-based student learning, offers social spaces, and provides departmental offices for faculty and staff. 

Healthcare Facilities | Jun 18, 2024

A healthcare simulation technology consultant can save time, money, and headaches

As the demand for skilled healthcare professionals continues to rise, healthcare simulation is playing an increasingly vital role in the skill development, compliance, and continuing education of the clinical workforce.

Mass Timber | Jun 17, 2024

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

Concrete Technology | Jun 17, 2024

MIT researchers are working on a way to use concrete as an electric battery

Researchers at MIT have developed a concrete mixture that can store electrical energy. The researchers say the mixture of water, cement, and carbon black could be used for building foundations and street paving.

Codes and Standards | Jun 17, 2024

Federal government releases national definition of a zero emissions building

The U.S. Department of Energy has released a new national definition of a zero emissions building. The definition is intended to provide industry guidance to support new and existing commercial and residential buildings to move towards zero emissions across the entire building sector, DOE says.

Multifamily Housing | Jun 14, 2024

AEC inspections are the key to financially viable office to residential adaptive reuse projects

About a year ago our industry was abuzz with an idea that seemed like a one-shot miracle cure for both the shockingly high rate of office vacancies and the worsening housing shortage. The seemingly simple idea of converting empty office buildings to multifamily residential seemed like an easy and elegant solution. However, in the intervening months we’ve seen only a handful of these conversions, despite near universal enthusiasm for the concept. 

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021