flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects


By By BD+C Staff | October 7, 2011
Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the companys energy

Otis Elevator Co. announced from the Greenbuild 2011 International Conference that it has won several contracts that solidify Otis’ commitment to providing sustainable solutions for its customers.

These new wins build upon the success of the company’s "The Way To Green" initiative, a global environmental program that spans every aspect of its operations, from design and manufacturing, to end-of-life product recycling.

The most substantial of the new contracts involves supplying and installing 700 energy-efficient elevators for an immense social housing reconstruction project in Jiangsu, China, one of the largest wins in Otis’ history in the country.

Under the contract, Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the company’s energy-efficient ReGen drive technology. ReGen drives capture energy generated by the elevators and deliver it back to the building for use by other systems. 

When completed over the next two years, the project will provide elevator service to 16,000 units of housing, covering an area of approximately 2.9 million sm.

The other recent contracts to supply and install energy-efficient elevators include:

  • The Lotte World Tower in Seoul, South Korea, the world’s second tallest building, which is set to be completed in 2015. Otis will supply and install 46 elevators and escalators, including 16 energy-saving Gen2 elevators
  • The Vodafone D2 GmbH corporate headquarters in Dusseldorf, Germany. Otis will supply and install 39 elevators, including 29 Gen2 elevators.  The Gen2 elevators will feature ReGen drives that reduce energy consumption by up to 75 percent compared to conventional systems with non-regenerative drives
  • Medical technology centers in Kaliningrad, Smolensk, Barnaul and Novosibirsk, Russia. Otis will supply and install a total of 28 elevators, 25 of which will be energy-efficient Gen2 elevators. BD+C

Related Stories

Giants 400 | Dec 2, 2020

2020 Airport Sector Giants: Top architecture, engineering, and construction firms in the U.S. airport facilities sector

AECOM, Hensel Phelps, and PGAL top BD+C's rankings of the nation's largest airport sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Nov 29, 2020

Top 40 Engineering Architecture Firms for 2020

Jacobs, AECOM, and Kimley-Horn top the rankings of the nation's largest engineering architecture (EA) firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2020 Giants 400 Report.

Giants 400 | Nov 29, 2020

Top 155 Architecture Firms for 2020

Gensler, Perkins and Will, and HKS Architects top the rankings of the nation's largest architecture firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2020 Giants 400 Report.

Giants 400 | Nov 29, 2020

Top 100 Architecture Engineering Firms for 2020

Stantec, HDR, and HOK head the rankings of the nation's largest architecture engineering (AE) firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2020 Giants 400 Report.

Government Buildings | Nov 25, 2020

New Indiana Toll Road headquarters creates unified environment for staff

New LEED Gold facility consolidates operations for tollway authority.

Architects | Nov 24, 2020

AEC Leaders share lessons from past downturns

Positions of passivity and cost-cutting run counter to the key lessons from AEC leaders who successfully navigated their firms through past market downturns.

Smart Buildings | Nov 20, 2020

The Weekly show: SPIRE smart building rating system, and pickleball court design tips

The November 19 episode of BD+C's The Weekly is available for viewing on demand.

Transportation & Parking Facilities | Nov 13, 2020

BIG and Kilo-designed Pegasus Pod transports first Hyperloop passengers

The pod achieves Hyperloop travel at speeds over 1000km/hour.

Government Buildings | Nov 13, 2020

Tax shortfalls nip government projects in the bud

Federal contracts are proceeding, but states and cities are delaying, deferring, and looking for private investment.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021