Kingspan Insulated Panels North America spotlighted its Environmental Product Declaration (EPD) as a centerpiece to the company’s main sustainability initiative Path to NetZero during Greenbuild 2011.
Visitors learned about the EPD recently awarded to the company’s wall and roof systems. Kingspan’s EPD is a first-of-its-kind achieved by a North American-based manufacturer of insulated metal panels. EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. Information in the declaration is based on an ISO-compliant life cycle assessment (LCA) and verified by a third party, in the case of Kingspan, Underwriters Laboratories Inc.
The booth introduced visitors to the company’s updated Path to NetZero microsite and the next generation of the mobile app. This tool for the building industry simulates the process of achieving high-performance and net-zero buildings. The revised app includes the addition of two Canadian cities – Calgary and Toronto – giving users a choice of six cities. In addition to a city, users select a building type (school, office, or warehouse) and a baseline building designed to ASHRAE 90.1.2004. They then choose an insulated roof and wall system and compare savings. Benchmarks for the tool are aligned with the Department of Energy Commercial Building Initiative and U.S. Green Building Council Leadership in Energy and Environmental Design (LEED) 2009/3.0 requirements. BD+C
Related Stories
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.
| Aug 21, 2012
Stellar wins four ABC Excellence In Construction awards
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.
| Aug 20, 2012
Protecting the artifacts at George H.W. Bush Presidential Library and Museum
Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.
| Aug 17, 2012
Ferreri joins PGAL as Principal
Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.
| Aug 17, 2012
Centric Architecture and PLAD Studio merge
The new firm will retain Centric Architecture as its name.
| Aug 15, 2012
MBH Architects announces new appointments
MBH Architects continues to grow, take on new clients.
| Aug 15, 2012
Architects and designers challenged in Allsteel’s reality design competition
KITS mobile app offers flexibility in planning.
| Aug 14, 2012
Leo A Daly welcomes Carl Gentilcore
Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.
| Aug 14, 2012
SOM Foundation announces prize recipients for 2012
Submissions for the SOM Prize were received from students at 34 schools in the U.S.
| Aug 9, 2012
Slideshow: New renderings of 1 WTC
Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.