Kingspan Insulated Panels North America spotlighted its Environmental Product Declaration (EPD) as a centerpiece to the company’s main sustainability initiative Path to NetZero during Greenbuild 2011.
Visitors learned about the EPD recently awarded to the company’s wall and roof systems. Kingspan’s EPD is a first-of-its-kind achieved by a North American-based manufacturer of insulated metal panels. EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. Information in the declaration is based on an ISO-compliant life cycle assessment (LCA) and verified by a third party, in the case of Kingspan, Underwriters Laboratories Inc.
The booth introduced visitors to the company’s updated Path to NetZero microsite and the next generation of the mobile app. This tool for the building industry simulates the process of achieving high-performance and net-zero buildings. The revised app includes the addition of two Canadian cities – Calgary and Toronto – giving users a choice of six cities. In addition to a city, users select a building type (school, office, or warehouse) and a baseline building designed to ASHRAE 90.1.2004. They then choose an insulated roof and wall system and compare savings. Benchmarks for the tool are aligned with the Department of Energy Commercial Building Initiative and U.S. Green Building Council Leadership in Energy and Environmental Design (LEED) 2009/3.0 requirements. BD+C
Related Stories
| Apr 10, 2013
6 funding sources for charter school construction
Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.
| Apr 10, 2013
23 things you need to know about charter schools
Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.