Johnsonite returns to the Greenbuild International Conference and Expo to highlight several of its environmentally responsible products, discuss environmental practices and initiatives.
Exhibit highlights include:
- Eco-Naturals Collection: Engineered for greater sustainability in rubber flooring tiles, treads and wall base using significant levels of rapidly renewable and pre-consumer waste stream materials. Eco-Naturals Eco-Shell with Cork contains 2.5% cork and 4.5% percent of walnut shell dust, pre-consumer and rapidly renewable resources. CorkTones contains 2.5% cork. The unique composition of the tiles does not contain phthalates, halogens or chlorine and the product only requires water and a neutral detergent to clean it.
- Harmonium xf: Made from 95% natural materials such as linseed oil, flax seed, wood and cork—73% of those rapidly renewable—this linoleum product has the highest rapidly renewable content in the industry and offers one of the lowest life-cycle costs available.
- Masquerade Contoured Wall Base: A unique Millwork finishing border with the look of exotic wood and expensive stone. There are 12 wood grain options and 11 stone options as well as options for customization. The product is FloorScore certified, can contribute LEED points, contains 14 percent pre-consumer recycled materials and is recyclable. BD+C
Related Stories
Accelerate Live! | Jul 6, 2017
Watch all 20 Accelerate Live! talks on demand
BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.
Healthcare Facilities | Jun 29, 2017
Uniting healthcare and community
Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.
Architects | Jun 25, 2017
Stantec adds RNL Design to its stable, fortifying several of its business units
The engineering giant also names successor to CEO who will retire at the end of this year.
Building Team | Jun 22, 2017
Seven lessons learned on commissioning projects
Commissioning is where the rubber meets the road in terms of building design.
Sponsored | Building Team | Jun 20, 2017
Plan ahead when building in the west
Getting a project through plan review can be an unusually long process, anywhere from six months to two years.
Architects | Jun 19, 2017
Preparing to negotiate: Get your head in the game
Logical and well-planned steps to effective negotiation.
| Jun 13, 2017
Accelerate Live! talk: Is the road to the future the path of least resistance? Sasha Reed, Bluebeam (sponsored)
Bluebeam’s Sasha Reed discusses why AEC leaders should give their teams permission to responsibly break things and create ecosystems of people, process, and technology.
| Jun 13, 2017
Accelerate Live! talk: Incubating innovation through R&D and product development, Jonatan Schumacher, Thornton Tomasetti
Thornton Tomasetti’s Jonatan Schumacher presents the firm’s business model for developing, incubating, and delivering cutting-edge tools and solutions for the firm, and the greater AEC market.
| Jun 13, 2017
Accelerate Live! talk: The future of computational design, Ben Juckes, Yazdani Studio of CannonDesign
Yazdani’s Ben Juckes discusses the firm’s tech-centric culture, where scripting has become an every-project occurrence and each designer regularly works with computational tools as part of their basic toolset.
Industry Research | Jun 13, 2017
Gender, racial, and ethnic diversity increases among emerging professionals
For the first time since NCARB began collecting demographics data, gender equity improved along every career stage.