Johnson Controls announced the Panoptix solution, a new approach to building efficiency that makes it easier and more affordable for owners and operators of any size facility to achieve better building performance.
The Panoptix solution includes four key components:
• An open technology platform that makes it easy to collect and manage data from disparate building systems and other data sources, such as meter and weather data.
• A suite of cloud-hosted building efficiency applications that work with any building management system, including Metasys® by Johnson Controls.
• On-line and by-phone Live Guide support, as well as on-site building and energy services to help customers implement operational improvements and energy-savings measures.
• An online Panoptix connected community of peers and experts committed to sharing best practices, news and resources.
“Johnson Controls is known for innovations that improve energy efficiency, sustainability and asset performance,” said Dave Myers, president, Building Efficiency, Johnson Controls. “What’s exciting about Panoptix is how we can now deliver these outcomes. An intuitive user experience and a subscription-based business model mean that sophisticated building management is now as accessible to a single building owner as it is to managers of global property portfolios.” BD+C
Related Stories
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.