flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Green initiative may scuttle high-rise projects in Berkeley, California, critics charge

Green initiative may scuttle high-rise projects in Berkeley, California, critics charge

Measure would mandate LEED Platinum on new high-rise construction


By Peter Fabris, Contributing Editor | June 4, 2014
View of Berkeley and Bay from Claremont Canyon. Photo: Urban via Wikimedia Commo
View of Berkeley and Bay from Claremont Canyon. Photo: Urban via Wikimedia Commons

Volunteers in Berkeley, Calif., are collecting signatures for the “Green Downtown & Public Commons Initiative,” a controversial measure that critics charge would halt some development in the city. The initiative has higher green standards and less flexible design guidelines—factors that developers say could stop two major projects, a proposed 180-foot high hotel and a 17-story apartment tower.

The initiative would mandate that developers planning a project taller than 60 feet use the “Green Pathways” provision of the Downtown Area Plan. This rule—currently optional—says that a developer can provide a higher level of community benefits in exchange for a fast-track approval process. Under Green Pathways, developers have to make structures LEED Platinum rather than LEED Gold; build more parking; include spaces for bicycles, electric cars and the handicapped; pay prevailing wages to construction and hotel workers; and make sure that half of a project’s construction workers are Berkeley residents.

The financial proposition for a high-rise hotel in Berkeley is fragile, according to a representative of the proposed hotel, and the new initiative would require additional setbacks and restrictions that would make it impossible to have enough rooms on each floor to make the project viable. The initiative calls for a minimum 15-foot setback, but the hotel developer says the structure must have a 10-foot setback to have enough space per floor.

City Councilman Jesse Arreguín, who supports the measure, says it is not intended to stop development, but is a way of getting developers to contribute more benefits to the downtown area.

(http://www.berkeleyside.com/2014/05/14/would-new-green-initiative-kill-two-downtown-high-rises/comment-page-1/)

Related Stories

Codes and Standards | Aug 6, 2019

New technology, aligning training with local trends among keys to workforce development

Construction industry must also invest in training, recruiting high school students.

Codes and Standards | Aug 1, 2019

Planners, city official rethink parking requirements on new projects

Reducing number of parking spots frees up land for ‘more purposeful’ uses.

Codes and Standards | Jul 31, 2019

USGBC-LA chooses first ‘Net Zero Accelerator’ technologies

Wide range of solutions address numerous environmental challenges.

Codes and Standards | Jul 30, 2019

Solar brokerage will provide financing for small/medium businesses

First to fund solar for smaller-scale commercial operations.

Codes and Standards | Jul 29, 2019

ASCE group unveils structural safety database

Confidential reporting on structural failures, near misses, and other incidents.

Codes and Standards | Jul 26, 2019

Floating landscape infrastructure wins top ASCE innovation prize

Climate resiliency a key theme of entrants.

Codes and Standards | Jul 24, 2019

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.

Codes and Standards | Jul 23, 2019

Berkeley, Calif. passes nation’s first ordinance to make new buildings all-electric

No gas hook-ups will be allowed in new houses, apartments, and commercial buildings.

Codes and Standards | Jul 22, 2019

San Francisco office building is city’s first structure certified by BREEAM USA for existing buildings

The Landmark @ One Market is one of San Francisco’s most architecturally distinctive buildings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021