flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Green Bay Packers to start construction on a business district near Lambeau Field this fall

Sports and Recreational Facilities

Green Bay Packers to start construction on a business district near Lambeau Field this fall

Flush with cash, the NFL team is kicking in about half of the $130 million for the 20-acre project’s first phase.


By John Caulfield, Senior Editor | August 24, 2015
Green Bay Packers to start construction on a business district near Lambeau Field this fall

Image: Titletown District, all renderings courtesy Green Bay Packers (via Green Bay Press Gazette)

This fall, the Green Bay Packers will break ground on Titletown District, a mixed-use development west of the NFL team's home of Lambeau Field. When completed in the fall of 2017, the first phase of Titletown District will include a hotel, a sports medicine center, a restaurant/brewery, and a 10-acre public plaza.

The Milwaukee Business Journal reports that the first phase of this project is expected to cost between $120 million and $130 million, with the Packers contributing $65 million of that total.

For several years, the Wisconsin-based team has been acquiring land in town and demolishing buildings in preparation for starting Titletown District. The first tenant, a 100,000-sf Cabela’s sporting goods outlet the retailer developed with the team, opened in July 2014 and drew 2.8 million visitors in its first 12 months in business.

The Journal reports that this fall the Packers and its Building Team—which includes Sterling Project Development, a New York real estate advisory firm; Rossetti, a Detroit architectural design and planning firm; and Biederman Redevelopment Ventures, a New York design consultant with expertise in public-spaces and streetscapes—will begin installing infrastructure on eight of the project’s 20 acres for initial tenants that will include a five-story, 150-room, four-diamond hotel to be call Lodge Kohler, which the bath and kitchen fixture supplier Kohler Co. will build and operate.

The hotel will not only provide rooms for fans attending Packers’ games, but should also benefit from the 700 events the team conducts annually.  

Other initial tenants will include a 20,000-sf Hinterland restaurant/brewery; and a 30,000-sf sports medicine facility called Bellin Health, which will feature lab, X-ray, and MRI services. The Packers’ team physician Dr. Patrick McKenzie will staff the clinic.

The publicly owned Packers reported $375 million in revenue for fiscal year 2015, up 16%. Team president Mark Murphy said the franchise continues to acquire land with an eye toward further regional economic development that could include residential buildings. 

 

Related Stories

Sports and Recreational Facilities | Oct 13, 2016

Ice in the desert: The practice facility for the NHL expansion team in Las Vegas hopes to engage the local community

“This design is all about drawing the community into the excitement of NHL hockey,” says Arnie Martinez, AIA, Director of Architecture for Leo A Daly.

Sports and Recreational Facilities | Oct 12, 2016

A wood-clad arena is rising in Copenhagen

The design of this 377,000-sf building makes concessions to the residential community that surrounds it.

Sports and Recreational Facilities | Sep 26, 2016

Julian B. Lane Riverfront Park in Tampa to undergo Skanska-led $35.6 million reconstruction project

The park will serve as an urban oasis of outdoor activities for the surrounding area.

Sports and Recreational Facilities | Sep 26, 2016

Mercedes-Benz Stadium in Atlanta will be the NFL’s first LEED Platinum stadium

The Atlanta Falcons new home is expected to save 40% in energy usage than a typical NFL stadium.

Sponsored | Reconstruction & Renovation | Sep 13, 2016

Daytona International Speedway becomes racing’s first modern stadium

Daytona International Speedway has undergone a $400 million full-scale makeover to update the facilities first built in 1959.

Sports and Recreational Facilities | Sep 1, 2016

U.S. Open stadium’s new retractable roof showcases innovative problem solving in its design and engineering

Mushy ground and indoor condensation were just two of the issues this $150 million project presented to its Building Team. 

Sports and Recreational Facilities | Aug 29, 2016

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.

Sports and Recreational Facilities | Aug 22, 2016

The Hills of Governors Island reach completion one year ahead of schedule

The man made hills are the latest attraction to open on the island that has been under development since 2006.

| Aug 15, 2016

SPORTS FACILITY GIANTS: New and renovated college sports venues - designed to serve students and the community

Schools are renovating existing structures or building new sports facilities that can serve the student body and surrounding community.

| Aug 15, 2016

Top 30 Sports Facility Engineering Firms

AECOM, Thornton Tomasetti, and ME Engineers top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021