![]() |
HOK designers from around the globe are able to collaborate and interact in real time in the fi rm’s new Advanced Collaboration Rooms. The high-tech videoconferencing spaces allow users to display (in high defi nition) and mark up multiple project-related documents simultaneously. |
9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms
To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.S.
HOK's Advanced Collaboration Rooms (ACR) combine Cisco's TelePresence high-resolution, interoperable videoconferencing technology with PolyVision's Thunder Virtual Flipchart System—a sort of digital easel pad that allows HOK designers to sketch ideas and "virtually" hang them in multiple ACRs so the entire team can collaborate in real time.
Thunder allows users to display images, video, documents, and even live views of computer desktops. Using a series of projectors and flat-screen TVs in each ACR, multiple ideas and documents can be displayed at one time, and all meeting notes can be saved, printed, and emailed instantly to participants.
"The ability to bring HOK's best creative minds together in these ACRs is a powerful new tool for our virtual design teams," says HOK CEO Patrick MacLeamy, who led the effort to develop the ACR concept. ACRs are currently installed at seven HOK offices, with six more installations planned this year.10. More AEC Collaboration Solutions
Collaboration tools are big at AEC firms. Architecture firm Perkins Eastman links its 13 offices worldwide through its award-winning proprietary intranet system, ORCHARD, which stands for "Online Resource for the Creative Harvest of Architecturally Relevant Discovery" (catchy, isn't it?). ORCHARD unites the firm's Practice Area Communities to share best design practices, insights, and lessons learned. More on Perkins Eastman's ORCHARD
Over at AEC giant Heery International, "e-communities" enable partnering between the firm's offices around the country. Interior designer Judy Peterson used the e-community to get feedback on whether a project should use LEED-CI alone, or LEED-CI with LEED for Core & Shell. The decision: CI only. More on Heery's e-communities
Engineering firm Walter P Moore created its "Communities of Practice" in 2008 to share expertise across its 13 offices. The "COPs"—in its healthcare, sports, aviation, parking consulting, and tall buildings practices—are staffed on a voluntary basis. The healthcare COP, with 27 volunteers, formed its own Medical Equipment Task Group to inventory medical equipment used in hospital projects. "It's great, because the folks in Houston and Florida who have seen every MRI known to man can pass that along to our new offices in California," says Kurt Young, PE, LEED AP, leader of WPM's healthcare COP. More on Walter P Moore's Communities of Practice
Related Stories
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.