flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Grand Louvre - Phase I honored with AIA Twenty-five Year Award

Museums

The Grand Louvre - Phase I honored with AIA Twenty-five Year Award

The award recognizes an architectural design that has stood the test of time for 25 years.


By AIA | December 15, 2016

Photo Credit: Benh Lieu Song, Wikimedia Commons

The Grand Louvre – Phase I in Paris has been selected for the 2017 AIA Twenty-five Year Award. Designed by I.M. Pei, FAIA, and his firm Pei Cobb Freed & Partners, the 71-foot-high glass and stainless steel pyramid now rivals the Eiffel Tower as one of France’s most recognizable architectural icons. Recognizing architectural design of enduring significance, the Twenty-five Year Award is conferred on a building project that has stood the test of time by embodying architectural excellence for 25 to 35 years. Projects must demonstrate excellence in function, in the distinguished execution of its original program, and in the creative aspects of its statement by today’s standards.  The project will be honored in April at the AIA National Convention in Orlando.

Greeted with hostility and derided as a Modernist affront when it was first proposed as the main entrance to Paris’ Musée du Louvre, the project was born of President François Mitterrand’s quest to modernize the Louvre in the early 1980s. Pei’s pyramid thrust the 800-year-old Palais complex into the modern era while simultaneously making the museum more accessible to larger crowds.   

When he was selected as the architect, Pei faced a seemingly insurmountable challenge: reorganizing and expanding the museum without compromising the historic integrity of one of France’s cherished monuments. To execute the project, Pei wove together an unprecedented amount of cultural sensitivity, political acumen, innovation, and preservation skill. As one juror noted, the project has become “an internationally renowned symbol for Paris and an example of the prowess and legacy of I.M. Pei.”

The entirety of the project, known as the Grand Louvre, was executed in two phases over the course of a decade. For the first phase, which gave rise to the pyramid, Pei reorganized the museum around the central courtyard, the Cour Napoléon, transforming it from a parking lot to one of the world’s great public spaces. 

Twenty-seven years since the project was completed, Pei’s success has been reaffirmed in the museum’s visitorship, which has more than tripled since the expansion. To accommodate the influx, the museum undertook its first renovation of the reception area directly beneath the pyramid recently and took distinct measures to maintain the integrity of Pei’s design.

Despite the rancor that surrounded the design’s unveiling, Pei gave France an unexpected treasure that its citizens and visitors from around the globe value as much as the priceless works of art contained within the Louvre. Bringing “life, action, and beauty to what was already beautiful,” as one juror noted, the project fused modernity with a swell in national pride for a historic building. 

Tags

Related Stories

Museums | Oct 10, 2016

New, larger Statue of Liberty Museum being built on Liberty Island

The museum will look to complement the Statue of Liberty without drawing attention away from it

Museums | Sep 21, 2016

Design guidelines for museums, archives, and art storage facilities

Specialty Buildings Column Series, Part 2 of 6 [Click Here to Part 1]

Museums | Sep 19, 2016

Museums refine their mission in the digital age

Preserving history is still their core function, but museums are using fresh approaches to engage an easily distracted public.

Museums | Sep 14, 2016

Architectural model museum opens in Japan

The museum includes models from Japanese architects including Shingeru Ban, Kengo Kuma, and Riken Yamamoto.

Museums | Sep 14, 2016

Finnish government halts plans for Guggenheim Helsinki

Construction of the museum relied heavily on state funding, which has officially been denied.

Museums | Jun 17, 2016

Construction begins on new and expanded International Spy Museum in Washington D.C.

The building will have a glass veil that surrounds an enclosed black box, a setup that the museum hopes will add vibrancy to its new L’Enfant Plaza location.

Education Facilities | Jun 1, 2016

Gensler reveals designs for 35-acre AltaSea Campus at the Port of Los Angeles

New and renovated facilities will help researchers, educators, and visitors better understand the ocean.

Museums | May 26, 2016

Napur Architect wins design contest for Budapest’s Museum of Ethnography

The Museum of Ethnography’s new home will be part of a large museum complex in Budapest’s City Park

Museums | May 2, 2016

Rippled facade defines Snøhetta’s San Francisco Museum of Modern Art expansion design

The museum will have three times as much gallery space as before, along with a new theater, atrium, and living wall.

Cultural Facilities | Apr 12, 2016

Studio Libeskind designs angular Kurdish museum rich with symbolism

The museum consists of four geometric volumes separated by somber and uplifting divisions.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021