flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Government work keeps green AEC firms busy

Government work keeps green AEC firms busy

With the economy picking up, many stalled government contracts are reaching completion and earning their green credentials.


By Robert Cassidy, Editorial Director | November 13, 2013
The Iowa Utilities Board/Office of Consumer Advocate building, in Des Moines, ea
The Iowa Utilities Board/Office of Consumer Advocate building, in Des Moines, earned a 100 Energy Star score, LEED Platinum, and

With the economy picking up, many stalled government contracts are reaching completion and earning their green credentials. A typical example: 50 United Nations Plaza, in San Francisco. Originally built in 1936, the $121 million renovation—financed from ARRA stimulus funds—is on the way to becoming the first General Services Administration historic renovation to achieve LEED Platinum. The 350,000-sf building will become GSA’s Region 9 headquarters. 

Other federal projects are a bit more offbeat. For example, the newest land port of entry in the U.S. (there are 167), designed by Julie Snow Architects, opened earlier this year in Van Buren, Maine. The 46,516-sf facility should gain LEED Gold certification, thanks to its highly efficient glazing and curtain wall, geothermal heating/cooling, zoned lighting, LED fixtures, occupancy sensors, and solar hot water system.

The port of entry, which replaced a flood-damaged facility, is responsible for 160 miles of the border with Canada. To balance security with surveillance capability, the main work areas are largely clad in glass fritted with a silk-screen pattern that provides both camouflage and glare protection.

WHERE GREEN (NOT ORANGE) IS THE NEW BLACK

Balancing security with sustainability, the Building Team for the 532,147-sf Wake County Detention Center, Raleigh, N.C., earned LEED Silver honors. The facility, which can hold 1,152 inmates, also houses city/county offices and a courtroom. Sustainable features include LED lighting, high-efficiency plumbing (saving 282,000 gal/year), and condensate recovery (another six million gal/yr in water savings).

Ten-hut! AEC firms fall in for military service

The Defense Department is a rich source of revenue for AEC firms like HDR Architecture and Mortenson Construction, which have teamed up on the design-build of a $94.9 million barracks complex for the 13th Combat Aviation Brigade at Fort Carson, Colorado Springs, Colo. The trio of four-story apartment buildings, totaling 370,156 gsf, will be built to LEED Gold standards. Solar walls, solar hot water panels, and PV arrays—which will generate a fourth of the annual energy needs for the building—will make the complex net-zero-energy ready.

At the National Naval Medical Center in Bethesda, Md., the JV design-build team Walbridge/Brasfield & Gorrie has completed the 151,450-sf Naval Exchange and 500-space parking structure. Constructed to antiterrorism/force protection standards, it replaced a much smaller 20-year-old exchange.

Designed by CMH Architects to LEED Gold levels, the Bethesda NEX was built partially into a hillside to take advantage of the earth’s insulating capabilities. A 53,000-sf green roof and extensive stormwater management system provide 11,200 cubic feet of rainwater harvesting. The exchange offers military families grocery and other retail stores, plus a dry cleaner, pharmacy, spa, wine shop, credit union, florist, food court, and optical center.

In Iowa, a new state penitentiary for 800 offenders nearing completion in Fort Madison represents a fundamental shift by the state corrections department toward more humane treatment of prisoners—including more environmentally friendly design.

The 475,000-sf facility uses a thousand or so geothermal wells to provide independent heating/cooling to its eight units. Ample daylighting is provided to inmate cells through a mechanical chase that acts as a tempered buffer zone to the unusually large cell windows.

“From a security viewpoint, this ‘back zone’ allowed us to reduce the thickness of the glass, which saved a lot of money,” says Michael Morman, AIA, LEED AP BD+C, Architect/Project Manager with Shive-Hattery, architect/engineer on the $132 million project. (Also on the Building Team: TOK, owner’s rep; HOK, design architect/engineer; Venture, AOR; The Weidt Group, utility partner; PBA, detention specialist; and the Walsh Group, GC.) “That allowed more windows, more daylighting, and easier maintenance, to get rid of the Alcatraz look.”

To control stormwater on the 42-acre site, the Building Team devised a catchment system that carries runoff to vaults and discharges it under the fence through eight-inch-diameter pipes, making a “Shawshank Redemption” escape impossible. The new prison, which will open early next year, is set to earn Gold under the LEED Campus (v2.2) program.

AIA COTE HONORS—AND MORE

The Hawkeye State is also home to one of the nation’s most energy-efficient new buildings, the Iowa Utilities Board/Office of Consumer Advocate Building, in Des Moines. The 44,500-sf office building not only made LEED Platinum, but also hit an Energy Star rating of 100 on the way to garnering a Top 10 Green Project from the AIA Committee on the Environment.

The $10 million, double-wing building, which opened in March, is projected to have an energy use of 28.0 kBtu/sf/year. Sustainable features include operable windows, six acres of native prairie restoration, stormwater management, water use reduction of 46%, and 12.5% of total energy use supplied by roof-mounted PVs.

Not to be outdone, the City and County of San Francisco Public Utilities Commission recently earned LEED Platinum for its new 13-story, 277,500-sf office building. The $146.5 million project won a Top Ten Plus Project Inaugural Award from AIA COTE. Its carbon footprint is half that of comparable buildings, due in part to a sculpted façade which channels air toward wind turbines that provide power to the building.

Related Stories

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 3, 2012

Zero Energy Research Lab opens at North Texas

The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.

| May 3, 2012

NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes

New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.

| May 3, 2012

Gilbane to provide CM services for North Reading’s integrated middle/high school

The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

| May 3, 2012

Ground broken for $94 million hospital expansion at Scripps Encinitas

New facility to more than double emergency department size, boost inpatient beds by 43%.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021