flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Government work keeps green AEC firms busy

Government work keeps green AEC firms busy

With the economy picking up, many stalled government contracts are reaching completion and earning their green credentials.


By Robert Cassidy, Editorial Director | November 13, 2013
The Iowa Utilities Board/Office of Consumer Advocate building, in Des Moines, ea
The Iowa Utilities Board/Office of Consumer Advocate building, in Des Moines, earned a 100 Energy Star score, LEED Platinum, and

With the economy picking up, many stalled government contracts are reaching completion and earning their green credentials. A typical example: 50 United Nations Plaza, in San Francisco. Originally built in 1936, the $121 million renovation—financed from ARRA stimulus funds—is on the way to becoming the first General Services Administration historic renovation to achieve LEED Platinum. The 350,000-sf building will become GSA’s Region 9 headquarters. 

Other federal projects are a bit more offbeat. For example, the newest land port of entry in the U.S. (there are 167), designed by Julie Snow Architects, opened earlier this year in Van Buren, Maine. The 46,516-sf facility should gain LEED Gold certification, thanks to its highly efficient glazing and curtain wall, geothermal heating/cooling, zoned lighting, LED fixtures, occupancy sensors, and solar hot water system.

The port of entry, which replaced a flood-damaged facility, is responsible for 160 miles of the border with Canada. To balance security with surveillance capability, the main work areas are largely clad in glass fritted with a silk-screen pattern that provides both camouflage and glare protection.

WHERE GREEN (NOT ORANGE) IS THE NEW BLACK

Balancing security with sustainability, the Building Team for the 532,147-sf Wake County Detention Center, Raleigh, N.C., earned LEED Silver honors. The facility, which can hold 1,152 inmates, also houses city/county offices and a courtroom. Sustainable features include LED lighting, high-efficiency plumbing (saving 282,000 gal/year), and condensate recovery (another six million gal/yr in water savings).

Ten-hut! AEC firms fall in for military service

The Defense Department is a rich source of revenue for AEC firms like HDR Architecture and Mortenson Construction, which have teamed up on the design-build of a $94.9 million barracks complex for the 13th Combat Aviation Brigade at Fort Carson, Colorado Springs, Colo. The trio of four-story apartment buildings, totaling 370,156 gsf, will be built to LEED Gold standards. Solar walls, solar hot water panels, and PV arrays—which will generate a fourth of the annual energy needs for the building—will make the complex net-zero-energy ready.

At the National Naval Medical Center in Bethesda, Md., the JV design-build team Walbridge/Brasfield & Gorrie has completed the 151,450-sf Naval Exchange and 500-space parking structure. Constructed to antiterrorism/force protection standards, it replaced a much smaller 20-year-old exchange.

Designed by CMH Architects to LEED Gold levels, the Bethesda NEX was built partially into a hillside to take advantage of the earth’s insulating capabilities. A 53,000-sf green roof and extensive stormwater management system provide 11,200 cubic feet of rainwater harvesting. The exchange offers military families grocery and other retail stores, plus a dry cleaner, pharmacy, spa, wine shop, credit union, florist, food court, and optical center.

In Iowa, a new state penitentiary for 800 offenders nearing completion in Fort Madison represents a fundamental shift by the state corrections department toward more humane treatment of prisoners—including more environmentally friendly design.

The 475,000-sf facility uses a thousand or so geothermal wells to provide independent heating/cooling to its eight units. Ample daylighting is provided to inmate cells through a mechanical chase that acts as a tempered buffer zone to the unusually large cell windows.

“From a security viewpoint, this ‘back zone’ allowed us to reduce the thickness of the glass, which saved a lot of money,” says Michael Morman, AIA, LEED AP BD+C, Architect/Project Manager with Shive-Hattery, architect/engineer on the $132 million project. (Also on the Building Team: TOK, owner’s rep; HOK, design architect/engineer; Venture, AOR; The Weidt Group, utility partner; PBA, detention specialist; and the Walsh Group, GC.) “That allowed more windows, more daylighting, and easier maintenance, to get rid of the Alcatraz look.”

To control stormwater on the 42-acre site, the Building Team devised a catchment system that carries runoff to vaults and discharges it under the fence through eight-inch-diameter pipes, making a “Shawshank Redemption” escape impossible. The new prison, which will open early next year, is set to earn Gold under the LEED Campus (v2.2) program.

AIA COTE HONORS—AND MORE

The Hawkeye State is also home to one of the nation’s most energy-efficient new buildings, the Iowa Utilities Board/Office of Consumer Advocate Building, in Des Moines. The 44,500-sf office building not only made LEED Platinum, but also hit an Energy Star rating of 100 on the way to garnering a Top 10 Green Project from the AIA Committee on the Environment.

The $10 million, double-wing building, which opened in March, is projected to have an energy use of 28.0 kBtu/sf/year. Sustainable features include operable windows, six acres of native prairie restoration, stormwater management, water use reduction of 46%, and 12.5% of total energy use supplied by roof-mounted PVs.

Not to be outdone, the City and County of San Francisco Public Utilities Commission recently earned LEED Platinum for its new 13-story, 277,500-sf office building. The $146.5 million project won a Top Ten Plus Project Inaugural Award from AIA COTE. Its carbon footprint is half that of comparable buildings, due in part to a sculpted façade which channels air toward wind turbines that provide power to the building.

Related Stories

Building Team | Jul 14, 2022

ABC’s construction backlog inches lower in June; Contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.

Sustainable Development | Jul 14, 2022

Designing for climate change and inclusion, with CBT Architects' Kishore Varanasi and Devanshi Purohit

Climate change is having a dramatic impact on urban design, in terms of planning, materials, occupant use, location, and the long-term effect of buildings on the environment. Joining BD+C's John Caulfield to discuss this topic are two experts from the Boston-based CBT Architects: Kishore Varanasi, a Principal and director of urban design; and Devanshi Purohit, an Associate Principal.

Multifamily Housing | Jul 14, 2022

Multifamily rents rise again in June, Yardi Matrix reports

Average U.S. multifamily rents rose another $19 in June to edge over $1,700 for the first time ever, according to the latest Yardi® Matrix Multifamily Report.

Building Team | Jul 14, 2022

Austin PBS gets a new state-of-the-art facility with three studios

Since the 1970s, Austin PBS, birthplace of the Austin City Limits TV series, has been based inside the communications building on the University of Texas campus—a space it has long outgrown.

Building Team | Jul 13, 2022

The YIMBY movement emerges as valuable advocate for affordable housing

Over the past few decades, developers grew accustomed to nothing but staunch opposition to dense affordable housing project proposals.

Energy | Jul 13, 2022

Electrification of buildings, new and old, furthers environmental responsibility and equity

 It’s almost a cliché in our industry, but nonetheless: The greenest building is the one that is already built. 

Building Team | Jul 13, 2022

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

A new entertainment and hospitality complex in Austin, The Pitch, has been made out of repurposed shipping containers. 

Codes and Standards | Jul 12, 2022

USGBC sets out principles for LEED’s future

The U.S. Green Building Council recently published a report containing principles outlining how LEED will evolve.

Building Team | Jul 12, 2022

10 resource reduction measures for more efficient and sustainable biopharma facilities

Resource reduction measures are solutions that can lead to lifecycle energy and cost savings for a favorable return on investment while simultaneously improving resiliency and promoting health and wellness in your facility.

Office Buildings | Jul 12, 2022

Miami office tower nears completion, topping off at 55 stories

In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021