flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gothic-style dance center breaks ground at University of Southern California

Gothic-style dance center breaks ground at University of Southern California

The Dance Center will be the first new school on the campus in 40 years 


By Pfeiffer Partners Architects  | April 24, 2014
Ground was broken on April 23 for the new Glorya Kaufman International Dance Center on the University of Southern California campus. Named for the donor, philanthropist Glorya Kaufman, the Center will be a home for dance education on the West Coast and the Pacific Rim. The endowment will fund the building and establish a bachelor of fine arts program combining dance instruction with business training and a liberal arts education.
 
Pfeiffer Partners is designing the building for the school, the first new school on the campus in 40 years, beginning with a concept design, a feasibility study and programming. The design team, USC faculty and leadership of the new school are working together to craft a new facility that physically and aesthetically connects to the rest of campus and reflects the University’s master plan goals and aspirations for the new school. The program for the three-story building will include a dance/performance studio, five dance studios, instructional classrooms, performer support spaces, costume storage, and faculty and administrative offices. The project also includes a significant outdoor courtyard in which the campus community can meet, interact and study in an environment that fosters creativity and innovation in teaching and dance. 
 
Prominently located near the Thornton School of Music, on West 34th Street at Watt Way, will function as a key transitional building from the main campus to the future university village being developed across Jefferson Boulevard. The center’s proximity to downtown Los Angeles’ Music Center, where Kaufman has sponsored several dance performances, will strengthen the whole area’s draw as a cultural destination.
 
One primary goal of the design is to achieve a contemporary building that reflects the University’s historic architectural precedents, rooted in Romanesque traditions and Collegiate Gothic style, with authenticity rather than mimicry of the past. Conceptually, the design presents a dynamic, highly contemporary dance facility clothed in tradition. 
 
 
“The building derives its strengths from the principles of traditional Gothic architecture, but is also inspired by Venetian Gothic vernacular. The building’s massing is broken into its components: five major dance studios and a dance performance room, which is expressed in the architecture of the fenestration and hierarchy of forms; large Gothic arched openings introduce generous amounts of natural light into the spaces as well as create monumental openings for major and minor entries into the building. The skin of the building will be Roman brick with large expanses articulated with a diaper pattern. The building’s floor-to-ceiling windows and detailed articulation of precast concrete will extend the richness of the campus’ architectural language to the street for the first time along Jefferson Boulevard,” explains Project Director William Murray, AIA, Principal with Pfeiffer Partners. 
 
 
 
 
 
 
 

Related Stories

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 7, 2011

ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan

The facility's design highlights the inherent link between environmental consciousness and religious reverence.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Oct 24, 2011

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter

AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.

| Oct 14, 2011

University of New Mexico Science & Math Learning Center attains LEED for Schools Gold

Van H. Gilbert architects enhances sustainability credentials.

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Sep 30, 2011

BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery

The new structure serves as the cemetery's focal architectural point and center of operations.  

| Sep 14, 2011

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.

boombox1
boombox2
native1

More In Category



Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021