flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Google to convert an Alabama coal-burning plant to a data center running on clean energy

Industrial Facilities

Google to convert an Alabama coal-burning plant to a data center running on clean energy

This would be the tech giant’s seventh data center in the U.S.


By John Caulfield, Senior Editor | June 26, 2015
Google to convert an Alabama coal-burning plant to a data center running on clean energy

This October, Tennessee Valley Authority will close its outdated Widows Creek coal plant in Stevenson, Ala., which had been providing energy to the region since the 1960s. Photo: TVA Web Team via Wikimedia Commons

The coal-producing industry has taken its lumps of late, a victim of natural gas fracking and restrictions on air pollution. This October, Tennessee Valley Authority (TVA) will finally close its outdated Widows Creek coal plant in Stevenson, Ala., which had been providing energy to the region since the 1960s, rather than knock heads with the EPA over tighter financial and environmental regulations.

That plant, located on 350 acres about 60 miles northeast of Huntsville, will be retrofitted into a data center that runs on renewable energy. Google has agreed to build this $600 million project, which would be its 14th data center globally, but the first it has committed to in eight years, according to the San Antonio Express-News.

Google’s data centers in Iowa and Oklahoma run on wind power, and the Alabama facility will operate solely on renewable energy, possibly a combination of wind and solar.

The company states on its website that it has recently expanded its data centers in the states of Georgia and Iowa, as well as in Singapore and Belgium. Construction on the Alabama plant is scheduled to begin early next year and to bring between 75 and 100 jobs to Jackson County.

Google’s data centers in Iowa and Oklahoma run on wind power, and the Alabama facility will operate solely on renewable energy, possibly a combination of wind and solar, the company states. The data center will be hooked up to TVA’s electrical transmission lines, and Google will work with the Authority to run renewable energy through the latter’s electrical grid.

Alabama Gov. Robert Bentley called this project “the start of a long-lasting, productive relationship with Google.” He credited the TVA’s chairman Joe Ritch for securing the project. Google will benefit from two state tax-abatement packages that stem from the passage, three years ago, of the Alabama Data Processing Center Incentive Enhancement Act, according to AL.com.

Gary Demasi, Google’s director of Global Infrastructure, said in a prepared statement that Google sees “a lot of potential in redeveloping large industrial sites like former coal plants, and we’re excited to bring a data center to Alabama.” Urs Hölzle, Google’s SVP for technical infrastructure, told the New York Times that the company would be evaluating “plausible projects” over the next 12 months.

The data center is expected to incorporate Google’s latest technology efficiencies, which allow it to get 3.5 times the computing power out of the same amount of energy, compared to five years ago.

Related Stories

| Sep 24, 2013

8 grand green roofs (and walls)

A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence. 

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 19, 2013

Roof renovation tips: Making the choice between overlayment and tear-off

When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

State Government Report [2013 Giants 300 Report]

Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.

| Aug 28, 2013

Federal Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest federal government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 27, 2013

Industrial Sector Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2013 Giants 300 Report.

boombox1
boombox2
native1

More In Category

Industrial Facilities

8 ways to cool a factory

Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021